My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHANNON€WILSON,INC. <br /> structural elements are included in Figure D-4; locations of the structural elements are shown in <br /> Figured D-5. <br /> Our analysis included the following general steps: <br /> I. Build the model under existing conditions. We used a Mohr-Coulomb constitutive <br /> model for the soil. Soil parameters for our model are based on the results of the <br /> borings, index laboratory tests, and our experience with similar soils. <br /> 2. Solve the model under gravity. The step is necessary to approximate the initial <br /> internal soil stress conditions and evaluate the earth pressures on the lower and upper <br /> bulkhead for the existing condition. The internal stresses and earth pressures depend <br /> on the sequence of construction of the two bulkheads. Based on discussions with the <br /> Port of Everett, we modeled the construction sequence assuming that the two existing <br /> bulkheads and deadman anchor were constructed simultaneously and then backfilled. <br /> This process results in wall deflection. <br /> 3. Incrementally remove the soil in front of the lower bulkhead to simulate excavation <br /> and solve the model. <br /> Based on discussion with NINE, we performed three analyses for different dredge <br /> configurations, as shown in Figures D-1 through D-3 in Appendix D. These analyses included <br /> variation of the current elevation of the mudline at the wall face and variation of the slope of the <br /> rnudline during dredging. The use of a temporary pile with a tieback in front of the existing <br /> bulkhead was also evaluated in these analyses. The analyses results are presented in <br /> Figures D-1 through Figure D-3 and include maximum lateral sheet pile displacement, sheet pile <br /> shear force, sheet pile moment, axial load, and anchor axial load. The results are presented in <br /> 1-foot excavation intervals. <br /> Based on the SSI analyses and discussions with VINE, we recommend that the mudline <br /> elevation during dredging at Segment C be no lower than elevation -3 feet at the face of the wall <br /> and that the slope of dredging be no steeper than 2.5H:1 V. In our opinion, this approach would <br /> allow for performing the proposed dredging without the need for additional temporary shoring. <br /> Our analyses indicate that bulkhead deflections for this condition would generally be less than <br /> about 1 inch. To further increase stability during dredging and reduce bulkhead deflections,we <br /> recommend that the dredging be performed in small sections (10 to 20 feet wide), where <br /> possible, and filled in prior to moving to the next section. <br /> 21-1-21761-003-RI f docx4p/cIp 21-1-21761-003 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.