Laserfiche WebLink
14 <br /> EXHIBIT A=4 <br /> SCOPE OF WORK <br /> for <br /> ADDITIONAL ENGINEERING SERVICES <br /> LIFT STATION NO. 24 REPLACEMENT PROJECT <br /> CITY OF EVERETT WORK ORDER NO. UP 3313 <br /> Background <br /> Murray, Smith&Associates, Inc. (MSA) has developed the following modifications to the <br /> original scope of work and fee estimate for engineering design for the Lift Station No. 24 <br /> Replacement Project, City of Everett Work Order No.UP 3313. The modifications to the <br /> scope of work reflect the current project to date as it has developed over the past few years. <br /> The original scope of work was developed in June 2009. Due to delays associated with <br /> property acquisition and permitting,the majority of the final design services was performed <br /> in 2011 and early 2012. Additional tasks, outside the original scope of work,were required <br /> to support the project as it has developed over the past few years. These additional tasks <br /> include: <br /> • Additional project management to reflect the extension of time and scope of the <br /> project over the past three years. <br /> • Additional surveying services to map the critical areas as defined by others. <br /> • .Additional support to assist the City with permitting and environmental reviews. <br /> • Additional support for permitting and environmental reviews associated with the <br /> creek relocation. • <br /> • Evaluation and inclusion of influent flow metering into the project. <br /> • Additional design services associated with the creek relocation. <br /> • Additional design services after the 90% submittal. <br /> • Servicesto acquire construction permits. <br /> • Evaluate impacts and accommodate the County's Silver Way culvert replacement <br /> project. <br /> • Design modifications resulting from the force main failure. <br /> Scope Modifications <br /> These additional tasks are defined as follows and are identified as additional task items to the <br /> original scope of work. <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC. • LS 24 WO#UP 3313 <br /> July 2012 Engineers/Planners Page 1 <br /> S:\DVoigt\Scwer Lift Sta 24_MSA_UP3313\Council and Bdgt Com4lmcod 5\Scopc of Work 8-10-12.doc <br /> 123 <br />