My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/09/05 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/09/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 8:40:55 AM
Creation date
5/19/2017 8:40:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> will also define the operating conditions and general maintenance items associated <br /> with the station. This general operations and maintenance manual will be compatible <br /> with the manual prepared by the Contractor. <br /> Conduct a workshop with City staff to review and receive comments on the draft <br /> O&M manuals prepared by the contractor and MSA. <br /> -11. Unanticipated Service—This subtask will include additional unanticipated labor <br /> and/or expenses not specifically identified herein. Such work items will be <br /> implemented on a work order basis and will be undertaken only after written <br /> authorization from the City. <br /> City Responsibilities: - <br /> 1. The City will provide full-time on-site inspector and will take the lead in <br /> administering and managing the construction contract and communicating with the <br /> construction contractor. <br /> 2. City will provided direction to MSA with respect to involvement in project meetings, <br /> submittal reviews, issuing clarifications, etc. <br /> 3. City will provide a single copy of complete and fully-coordinated construction <br /> markups for production of as-built plans. <br /> Deliverables: <br /> 1. Responses to submittals, clarifications, changes as requested by the City. <br /> 2. Operation and maintenance manual review comments and submission of a draft and <br /> final operation and maintenance narrative prepared by MSA. Deliverables are as <br /> follows: <br /> • 5 CDs with electronic copies of the manuals <br /> • 3 bound hard copies of the manuals <br /> 3. Record Drawings as follows: <br /> • 1 CD with electronic copies of the drawings <br /> • 1 unbound copy of drawings (11"x 17") <br /> • 2 bound copies of drawings (11"x 17") <br /> • 1 unbound copy of drawings(22"x 34") <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC. LS 24 WO#UP 3313 <br /> July 2012 Engineers/Planners Page 8 <br /> S:\DVoigt\Sewer Lift Sta 24_MSA_UP3313\Council and Bdgt Com\Amend 5\Scope of Work 8-10-12.doc <br /> 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.