My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:57:21 AM
Creation date
5/19/2017 9:56:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preconstruction Services Contract <br /> -. i General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream), Phase C2(Solids Handling) <br /> AGREEMENlT �' h LF 3� S x Y F f y <br /> ' f x" i ��� .�. �'° -'F.- 1s S s f < s-;"� '+r--:s ` ti,t rx �, •- <br /> 1. Scope of Work: GC/CM shall render the Preconstruction Services called for <br /> in this Contract, including the Preconstruction Work Plan in Attachment A <br /> dated October 3, 2012 and the Preconstruction Services Scope of Work in <br /> Attachment B dated October 3, 2012. The GC/CM shall render the <br /> Preconstruction Services as expeditiously and completely as necessary to <br /> ensure that the cost and schedule objectives in Section 2.D and Section 3.0 <br /> of the Request for Proposals are met. <br /> While the Project will be constructed as separate.Phases, Liquid Stream <br /> (Phase C1) and Solids Handling (Phase C2), this Contract covers both <br /> Phases unless the Contract is terminated by the Owner or the Contract is <br /> modified by mutual amendment. The Owner intends to initially authorize <br /> Preconstruction Services for the Liquid Stream Phase Cl. The GC/CM may <br /> not proceed with Preconstruction Services related to the Solids Handling <br /> Phase C2 of the Project without prior written approval from the Owner. <br /> 2. Compensation: Owner will pay GC/CM a time and expense, not-to-exceed <br /> amount up to $875,136.00, excluding Washington State sales tax for <br /> satisfactorily performed Preconstruction Services authorized by the Contract. <br /> This Contract amount specifically includes all of the GC/CM's direct and <br /> indirect costs arising out of or related to the performance of the <br /> Preconstruction Services authorized in the Contract, including but not limited <br /> to profit, overhead, supervision, labor, supplies, materials, equipment or use <br /> .thereof, taxes, relocation costs, travel, communication, and office space. The <br /> GC/CM shall submit monthly invoices and will be paid monthly for <br /> satisfactorily completed work and services based on actual time and <br /> expenses without markup, up to the not-to-exceed total compensation set <br /> forth above. Any amount that exceeds the total compensation agreed to will <br /> be at the GC/CM's sole cost and expense, unless there are scope changes in <br /> the Preconstruction Services authorized by a mutual and written amendment <br /> to this Contract. If the Parties agree by amendment to this Contract for the <br /> GC/CM to add personnel not included in the Preconstruction Work Plan, their <br /> fully loaded hourly rate shall be consistent with the hourly rates included in <br /> Attachment A, "Preconstruction Work Plan" to this Contract. Work to prepare <br /> for and conduct negotiations on the Maximum Allowable Construction Cost <br /> City of Everett Page 2 of 13 October 3,2012 <br /> Water Pollution Control Facility Expansion <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.