I <br /> Description Horizontal Elevation Notes <br /> Location <br /> Gravity sewer Coordinates, Recalculate actual slopes. <br /> and drain lines stations,and I.E. 0.01 ft. All inverts in manholes. <br /> offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates and Record all angle points and <br /> watermains and stations 0.1 ft. I.E. 0.1 ft. finished ground elev.above <br /> transmission lines the invert elev. <br /> All other items, incl. Show dimensions on <br /> Electrical and 0.1 ft. 0.1 ft. record drawings. <br /> Structural <br /> Use red pen or pencil to make changes on the record drawings.Notations are to be neat, legible, ' <br /> clear and concise. <br /> Record information concurrently with the progress of construction. Conceal no work until the <br /> required information is verified and recorded. <br /> 1-08.11(3) Payment <br /> No separate payment shall be made for the preparation of record drawings. All costs associated <br /> with the preparation of record drawings shall be included in the unit contract prices of other <br /> items in the Contract. <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> Measurement by the Ton: Where items are specified to be paid for by the ton it will be the <br /> Contractor's responsibility to see that a certified weight ticket is given to the City's Inspector on <br /> the Project at the time of delivery of materials for each truckload delivered. Pay quantities will <br /> be prepared on the basis of certified weight tickets delivered to the City's Inspector at time of <br /> delivery of materials. Tickets not received by the City's Inspector on day of delivery will not be <br /> honored for payment. <br /> 1-09.3 Scope of Payment <br /> Supplement 1-09.3 by adding the following: <br /> 1-09.3(1) Schedule of Values <br /> (******) <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or in <br /> part,then the Schedule of Values for that portion of the Work shall also be based on unit prices. <br /> If the Proposal Form calls for a lump sum price, in whole or in part,then the Schedule of Values <br /> shall: reasonably allocate the Contract Sum among the various portions of the Work; be <br /> complete; be organized to include detailed breakdown of each major unit of the Work; be <br /> organized to correspond to Contractor's schedule; break down the Contract Sum showing the <br /> value assigned to each part of the Work; include an allowance for profit and Overhead; include <br /> Unit Price Work, if and to the extent indicated on the Proposal Form; be so organized as to <br /> facilitate assessment of Work and payment of Subcontractors; and be balanced. To the greatest <br /> extent possible, the breakdown shall use the same tasks or units as the Contractor's schedule. <br /> Contractor shall provide documentation substantiating the cost allocation if asked by the City's <br /> Representative. Upon acceptance of the Schedule of Values by the City's Representative, it <br /> shall be used as a basis for all requests for payment. <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP- 115 <br />