Laserfiche WebLink
I <br /> Dispose of unsuitable material removed to make room for foundation material by <br /> hauling to a waste site obtained and provided by the Contractor in accordance with 2- <br /> 03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> All costs for disposing of excavated material, whether within the Project limits or <br /> hauled to a disposal site, shall be incidental to the other Bid items in the Proposal. <br /> The City will not pay for hauling. Disposal of excavated material shall meet the <br /> requirements of 2-03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with consistency having <br /> approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. Use (� <br /> wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, gravel <br /> borrow, washed sand or crushed surfacing top course, the respective limits for trench <br /> width or backfill dimensions shall be approved by the Inspector. <br /> 2-09.4 Measurement <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09.5 Payment <br /> Delete all paragraphs in 2-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Structure Excavation" in the Proposal, all Work in this section <br /> shall be included with the respective Bid Items of the Contract with no direct compensation <br /> made. <br /> 2-11 TRIMMING AND CLEANUP <br /> 2-11.3 Construction Requirements <br /> Supplement 2-11.3 by adding the following after item 6: <br /> 7. Keep City streets clean and free from mud, dirt and other debris. <br /> Further supplement 2-11.3 by adding the following: <br /> Keep the Project site in a neat and orderly condition during the process of construction with as <br /> little disruption to the adjoining properties as practical under the conditions. <br /> Promptly and as often as needed cleanup debris resulting from Contractor's operations from <br /> drainage facilities such as inlets,catch basins, culverts and open ditches. <br /> Remove and dispose of all construction stakes. <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 145 <br />