Laserfiche WebLink
I <br /> 111 Upon Project completion, clean Project area and neatly dress slopes to present a uniform <br /> appearance blending into the contour of adjacent properties. Remove trash of all kinds resulting <br /> from construction operations. <br /> 2-11.4 Measurement <br /> Delete all paragraphs in 2-11.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-11.5 Payment <br /> Delete all paragraphs in 2-11.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for"Trimming and Cleanup" in the Proposal,all Work in this section <br /> I1 shall be included with other Work with no direct compensation made. <br /> I <br /> t <br /> I <br /> I <br /> I <br /> I <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP - 146 <br />