My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 4 <br /> Aggregates for asphalt treated base shall be manufactured from ledge rock, talus, or gravel, in <br /> I accordance with provisions of Section 3-01 that meet the following test requirements: <br /> Los Angeles Wear, 500 Rev. 30%max. <br /> Degradation Factor 15 min. <br /> Aggregates for asphalt treated base shall meet the following requirements for grading: <br /> Sieve Size Percent Passing <br /> 1 2" 99-100 <br /> 1/2" 56-100 <br /> I No. 4 32-72 <br /> No. 10 22-57 <br /> No.40 8-32 <br /> No. 200 2.0-9.0 <br /> All percentages are by weight. <br /> I The grade of paving shall be as required in the Contract. <br /> 4-06.3 Construction Requirements <br /> Do NOT construct the asphalt treated base course until all underground utilities are completed <br /> and inspected and approved by the Engineer. <br /> I Asphalt treated base may be placed for providing temporary access to adjoining properties <br /> where directed by the Engineer. <br /> ,I 4-06.3(1) Asphalt Mixing Plant <br /> Asphalt mixing plants for asphalt treated base shall meet the following requirements: <br /> I Heating <br /> The plant shall be capable of heating the aggregates to the required temperature. <br /> Proportioning <br /> The mixing plant shall be capable of proportioning: the aggregates to meet the Specifications; <br /> and the asphalt at the rate specified by the Engineer. If the aggregates are supplied in two or <br /> more sizes, means shall be provided for proportioning or blending the different sizes of <br /> aggregates to produce material meeting the Specification requirements. <br /> Mixing <br /> The mixer shall be capable of producing a uniform mixture of uniformly coated aggregates <br /> meeting the requirements of these Specifications. <br /> 4-06.3(2) Preparation of Aggregates <br /> Aggregates for asphalt treated base shall be stockpiled before use in accordance with the <br /> !', requirements of Section 3-02. <br /> 111 The aggregates shall be heated as required by the Engineer. <br /> 4-06.3(2)A Mix Design <br /> I The mix design requirements for asphalt treated base shall be as described in Section 5- <br /> 04.3(7)A. <br /> 4-06.3(3) Heating of Asphalt material <br /> IHeating of the asphalt material shall conform to the requirements of Section 5-04.3(1). <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> I AND CSO CONTROLS (SRO1, SR02, AND SRO3) <br /> WO No—UP3398-31 SP- 148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.