My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 5-04.4 Measurement I <br /> Delete all paragraphs of 5-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 5-04.5 Payment <br /> Delete all paragraphs in 5-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Supplement Division 5 of the Standard Specifications by adding the following: I <br /> 5-06 PAVEMENT PATCHING <br /> (******) <br /> 5-06.1 Description <br /> This Work shall consist of the reconstruction and patching of trenches and other excavations in <br /> paved streets and other paved areas. <br /> 5-06.2 Materials <br /> Provide materials conforming to the requirements specified for the materials in Sections 5-04 <br /> 5-05 of the Standard Specifications except as modified by these Special Provisions. V <br /> For HMA pavement patching provide HMA CL 1/2", PG 64-22 as specified in Section 5-04 of <br /> the Standard Specifications. <br /> Provide asphalt for temporary pavement patch as either: cold mix asphalt(MC 250)per Section <br /> 9-02 of the Standard Specifications or hot mix asphalt (HMA CL 1/2", PG 64-22). Mineral <br /> aggregate of MC 250 shall meet the same requirements as the aggregates used in HMA CL <br /> 1/2", PG 64-22. <br /> For tack coat provide emulsified asphalt grade CSS-1 as specified in 9-02.1(6) of the Standard <br /> Specifications. <br /> For cement concrete pavement patching provide Type III (H.E.S.)with minimum 4,000 psi 28- <br /> day compressive strength and having curing time of five days. <br /> Provide crushed surfacing top course used for pavement patching conforming to the <br /> requirements of 9-03.9(3)of the Standard Specifications. <br /> 5-06.3 Construction Requirements <br /> 5-06.3(1) General <br /> Schedule pavement patching to accommodate the demands of traffic and perform as rapidly as <br /> possible to provide maximum safety and convenience to public traffic. <br /> Placing and compact the trench backfill and the preparation and compaction of the subgrade in <br /> accordance with the various applicable sections of the Standard Specifications except as <br /> modified by these Special Provisions. <br /> Before the pavement patch is to be constructed saw cut the pavement so that the marginal edges <br /> of the patch will form a rectangular shape with straight edges and vertical faces. <br /> Provide signs, barricades, lights and other warning devices in accordance with the requirements <br /> of the "Manual on Uniform Traffic Control Devices"and they maintain 24-hours a day until the <br /> patching work is completed and ready for traffic. <br /> Complete subgrade compaction prior to the required patching. Compact subgrade to 95-percent <br /> as determined by the ASTM D2922(nuclear method). <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.