My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 6-02.3(29)E LS#9 Structure,for Screening Equipment. <br /> I Contractor shall modify existing manhole W02 and construct an adjacent concrete vault to <br /> accommodate new mechanical screening equipment. Contractor shall coordinate connections <br /> and construction of appurtenance to accommodate the proposed mechanical screening <br /> equipment, as recommended by the manufacture <br /> I Contractor shall excavate,remove existing manhole cone sections,as necessary, and install new <br /> riser sections and top slab to accommodate equipment. Contractor shall install a pre-cast vault <br /> I and top slab adjacent to manhole in accordance with the plans and to accommodate the <br /> equipment discharge chute. <br /> Contractor shall install conduit connection to structure and coordinate with the city for <br /> I power/communication. <br /> 6-02.4 Measurement <br /> Delete all paragraphs of 6-02.4 and substitute the following: <br /> I Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I 6-02.5 Payment <br /> Delete all paragraphs in 6-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> I described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> IHAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP—160a <br />
The URL can be used to link to this page
Your browser does not support the video tag.