Laserfiche WebLink
I <br /> 1 <br /> 6-02.3(29)E LS#9 Structure,for Screening Equipment. <br /> I Contractor shall modify existing manhole W02 and construct an adjacent concrete vault to <br /> accommodate new mechanical screening equipment. Contractor shall coordinate connections <br /> and construction of appurtenance to accommodate the proposed mechanical screening <br /> equipment, as recommended by the manufacture <br /> I Contractor shall excavate,remove existing manhole cone sections,as necessary, and install new <br /> riser sections and top slab to accommodate equipment. Contractor shall install a pre-cast vault <br /> I and top slab adjacent to manhole in accordance with the plans and to accommodate the <br /> equipment discharge chute. <br /> Contractor shall install conduit connection to structure and coordinate with the city for <br /> I power/communication. <br /> 6-02.4 Measurement <br /> Delete all paragraphs of 6-02.4 and substitute the following: <br /> I Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I 6-02.5 Payment <br /> Delete all paragraphs in 6-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> I described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> IHAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP—160a <br />