My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> DIVISION 7—DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, I <br /> AND CONDUITS <br /> 7-04 STORM SEWERS I <br /> 7-04.1 Description <br /> Revise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the Plans and <br /> in accordance with COE Standard Drawings, the Standard Specifications and these Special <br /> Provisions. <br /> Supplement 7-04.1 as follows: <br /> 7-04.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-04.2 Materials <br /> Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Use the following pipe materials for storm sewers: <br /> Rigid <br /> DI (ductile Iron) all diameter sizes <br /> Thermoplastic <br /> PVC(Polyvinylchloride) all diameter sizes <br /> PE(Polyethylene) all diameter sizes <br /> PP(Polypropylene),dual wall 12 to 27 inches diameter <br /> PP(Polypropylene),triple wall 30 inches and larger diameter <br /> Materials shall meet the requirements of the following sections: <br /> Ductile Iron Pipe 9-05.13 Standard Specifications I <br /> Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> and Joints <br /> Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br /> and Joints <br /> Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br /> Sewer Pipe and Joints I <br /> Corrugated Polypropylene Storm 9-05.24 Special Provisions <br /> Sewer Pipe <br /> Revise the last paragraph in 7-04.2 to read as follows: <br /> Unless specific pipe material is listed in the Plans, provide the specified schedule and diameter <br /> of either DI, PVC, or PE/PP materials listed above. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have been <br /> approved for pipe diameters larger than those listed. <br /> On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPl.cfm <br /> Or by mail at: <br /> PO Box 167 <br /> Olympia,WA 98507-0167 <br /> (360) 709-5442 <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.