My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Bid Item 15—TRUNK C CONNECTION AND FLOW MODIFICATIONS— <br /> SIPHON HEADWORKS STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Trunk C Connection and Flow Modifications — Siphon Headworks <br /> Structure shall be full compensation for all labor, material, tools and equipment necessary to <br /> satisfactorily complete the work including, but not be limited to, all costs for structure <br /> excavation; backfill; 72-inch pipe connect to structure; internal weir modifications; and removal <br /> of steel plate in parshall flume as defined in the specifications and shown on the Plans <br /> No specific unit of measure shall apply to the lump sum item of Trunk C Connection and Flow <br /> Modifications—Siphon Headworks Structure. <br /> Also included shall be the cost to furnish and install the slide gate on the south wall of the SHW <br /> structure over proposed 30-inch I.D. bypass pipe connection. <br /> Also included shall be the cost for the epoxy coating of internal surfaces of the SHW <br /> structure.[Modified per Addendum#1] <br /> Bid Item 16—SIPHON HEADWORKS ENTRY-STRUCTURE DEMOLITION <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Siphon Headworks Entry Structure Demolition shall be full <br /> compensation for all labor, material,tools and equipment necessary to satisfactorily complete the <br /> work including, but not limited to, excavation, demolition, and offsite disposal of the above <br /> ground structure; furnishing and installing new hatches in existing slab; staircase railing removal <br /> and modifications as defined in the specifications and shown on the Plans. <br /> • <br /> No specific unit of measure shall apply to the lump sum item of Siphon Headworks Entry <br /> Structure Demolition. <br /> Bid Item 17—SIPHON PIPE INSPECTION AND FLOW METER STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Siphon Pipe Inspection and Flow meter Structure shall be full <br /> compensation for all labor, material, tools and equipment necessary to satisfactorily complete the <br /> work including, but not be limited to, all costs for structure excavation; backfill; construction of <br /> vault-structure and internal walls; existing and proposed pipe connection; conduit connections <br /> and other associated appurtenances defined in the specifications and shown on the Plans. <br /> No specific unit of measure shall apply to the lump sum item of Siphon Pipe Inspection and <br /> Flow meter Structure. <br /> I <br /> I <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> ' WO No—UP3398-31 SP—32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.