i <br /> Bid Item 15—TRUNK C CONNECTION AND FLOW MODIFICATIONS— <br /> SIPHON HEADWORKS STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Trunk C Connection and Flow Modifications — Siphon Headworks <br /> Structure shall be full compensation for all labor, material, tools and equipment necessary to <br /> satisfactorily complete the work including, but not be limited to, all costs for structure <br /> excavation; backfill; 72-inch pipe connect to structure; internal weir modifications; and removal <br /> of steel plate in parshall flume as defined in the specifications and shown on the Plans <br /> No specific unit of measure shall apply to the lump sum item of Trunk C Connection and Flow <br /> Modifications—Siphon Headworks Structure. <br /> Also included shall be the cost to furnish and install the slide gate on the south wall of the SHW <br /> structure over proposed 30-inch I.D. bypass pipe connection. <br /> Also included shall be the cost for the epoxy coating of internal surfaces of the SHW <br /> structure.[Modified per Addendum#1] <br /> Bid Item 16—SIPHON HEADWORKS ENTRY-STRUCTURE DEMOLITION <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Siphon Headworks Entry Structure Demolition shall be full <br /> compensation for all labor, material,tools and equipment necessary to satisfactorily complete the <br /> work including, but not limited to, excavation, demolition, and offsite disposal of the above <br /> ground structure; furnishing and installing new hatches in existing slab; staircase railing removal <br /> and modifications as defined in the specifications and shown on the Plans. <br /> • <br /> No specific unit of measure shall apply to the lump sum item of Siphon Headworks Entry <br /> Structure Demolition. <br /> Bid Item 17—SIPHON PIPE INSPECTION AND FLOW METER STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Siphon Pipe Inspection and Flow meter Structure shall be full <br /> compensation for all labor, material, tools and equipment necessary to satisfactorily complete the <br /> work including, but not be limited to, all costs for structure excavation; backfill; construction of <br /> vault-structure and internal walls; existing and proposed pipe connection; conduit connections <br /> and other associated appurtenances defined in the specifications and shown on the Plans. <br /> No specific unit of measure shall apply to the lump sum item of Siphon Pipe Inspection and <br /> Flow meter Structure. <br /> I <br /> I <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> ' WO No—UP3398-31 SP—32 <br />