Laserfiche WebLink
1 <br /> I <br /> Bid Item 18 —SRO1 REGULATOR STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for SROI Regulator Structure shall be full compensation for all labor, <br /> material, tools and equipment necessary to satisfactorily complete the work including, but not be <br /> limited to, all costs for structure excavation; backfill; construction of vault-structure and internal <br /> walls; existing and proposed pipe connection; grouting inverts; furnishing and installing weir and <br /> scum plates; conduit connections and other associated appurtenances defined in the <br /> specifications and shown on the Plans. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SR02,AND SR03) <br /> WO No—UP3398-31 SP—32a <br />