1 <br /> No specific unit of measure shall apply to the lump sum item of SRO1 Regulator Structure. <br /> Bid Item 19—SRO2 REGULATOR STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for SRO2 Regulator Structure shall be full compensation for all labor, <br /> material, tools and equipment necessary to satisfactorily complete the work including, but not be <br /> limited to, all costs for structure excavation; backfill; construction of vault-structure and internal <br /> walls; existing and proposed pipe connection; grouting inverts; furnishing and installing weir and <br /> scum plates; conduit connections and other associated appurtenances defined in the <br /> specifications and shown on the Plans. <br /> No specific unit of measure shall apply to the lump sum item of SRO2 Regulator Structure. <br /> Bid Item 20—TRUNK C FLOW SCREENING STRUCTURE <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Trunk C Flow Screening Structure shall be full compensation for all <br /> labor, material, tools and equipment necessary to satisfactorily complete the work including, but <br /> not be limited to, all costs for structure excavation; backfill; construction of vault-structure and <br /> internal walls; providing and installing trash rack; connection of LS#9 force main connections; <br /> proposed pipe connection and grouting inverts; conduit connections and other associated <br /> appurtenances defined in the specifications and shown on the Plans. <br /> No specific unit of measure shall apply to the lump sum item of Trunk C Flow Screening <br /> Structure. <br /> Bid Item 21 —LS#9 STRUCTURE, FOR SCREENING EQUIPMENT <br /> Specification Section 6-02 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for LS #9 Structure, for Screening Equipment shall be full compensation <br /> for all labor, material, tools and equipment necessary to satisfactorily complete the work <br /> including, but not be limited to, all costs for structure excavation; backfill; removal and <br /> replacement of existing manhole riser segments; construction of vault-structure; furnishing and <br /> installing debris receptacle; installation of new top slab on existing manhole; conduit connections <br /> and other associated appurtenances defined in the specifications and shown on the Plans. <br /> No specific unit of measure shall apply to the lump sum item of LS #9 Structure, for screening <br /> Equipment. <br /> SPECIFICATION DIVISION 7 <br /> Bid Item 22—POLYPROPYLENE STORM PIPE, 12-INCH DIA <br /> Specification Section 7-04 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP -33 <br />