My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> The unit price per linear foot bid for the Polypropylene Storm Pipe shall be full compensation for <br /> all labor, material, incidentals, tools and equipment necessary to satisfactorily complete the work <br /> as defined in these Special Provisions and as shown on the Plans. <br /> The unit price per linear foot bid for the Storm Drain Pipe shall be full pay for furnishing, 111 <br /> hauling, and assembling in place the completed installation, including all wyes, tees, special <br /> fittings, joint materials and adjustment of inverts to inlets, connections to catch basins and <br /> manholes or combined sewer main for the completion of the installation to the required lines and <br /> grades. <br /> Removing and disposing of existing storm drain piping and abandonment of existing monitoring <br /> wells in conflict with proposed pipes, is incidental. <br /> All costs in jointing dissimilar types of storm drain pipe with a coupling, adapter or concrete <br /> collar shall be included in the unit price for this bid item. <br /> Excavation, stockpiling, hauling and dewatering is incidental and shall be included in the unit <br /> price for this bid item. I <br /> The costs for pot-holing and excavation required to determine exact depths and locations of other <br /> utilities and installing Ethafoam pads between pipe and existing utilities shall be considered as <br /> incidental to the work and these costs shall be included in the unit contract price. <br /> Measurement and payment will be based on horizontal length of storm drain pipe constructed. <br /> Bid Item 23 —MANHOLE TYPE 1, 48-INCH DIA <br /> Bid Item 24—MANHOLE TYPE 1, 54-INCH DIA <br /> Bid Item 25—MANHOLE TYPE 1, 72-INCH DIA <br /> Bid Item 26—MANHOLE TYPE 2, 54-INCH DIA <br /> Bid Item 27—MANHOLE TYPE 3, 84-INCH DIA <br /> Specification Section 7-05 <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each manhole shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in the Standard <br /> Specifications, Standard Plans,these specifications and as shown on the Plans. <br /> The Contractor shall provide and install all manhole components and accessories, including <br /> ductile iron manhole frames and covers (PAMREX 24-inch Model 600 or East Jordan Iron <br /> Works Model 00104042L01) in lieu of cast iron rings and covers identified on COE Standard <br /> Drawing 607. <br /> The initial sawcutting, removing and disposing of existing pavement, sidewalks and curbs is <br /> incidental. <br /> The unit price of per each manhole shall also include, but not be limited to, all costs for <br /> excavation, removing and disposing of existing pipe and existing manholes, hauling and <br /> disposing of surplus or unsuitable material, dewatering, furnishing and installing couplings <br /> furnishing and installing steps or ladder, placing and compacting native backfill, furnishing, <br /> placing, and compacting foundation material as required, cleaning and flushing manholes, <br /> reconnecting existing sanitary sewer connections, and replacing, protecting and maintaining <br /> utilities. <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP -34 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.