Laserfiche WebLink
I <br /> Adjusting all manhole rings and covers to final grade shall be included in the unit price for this <br /> bid item. <br /> Also included is installation of field-formed concrete channels and benches inside all manhole <br /> bases. Pre-cast or pre-formed channel bases are not acceptable. <br /> The cost of pipe materials and installation is included in this bid item. The cost of connection of <br /> pipes, except for drop connections, is included in this bid item. <br /> Measurement and payment shall be per each manhole installed as measured upon completion. <br /> Bid Item 28—CATCH BASIN,TYPE B <br /> Bid Item 29—CATCH BASIN,TYPE 2, 48-INCH DIA <br /> Specification Section 7-05 <br /> Measurement and Payment: Unit Price per Each <br /> The unit price bid item for each Catch Basin Inlet shall be full compensation for all labor, <br /> material, incidentals, tools and equipment necessary to satisfactorily complete the work as <br /> defined in these Special Provisions and as shown on the Plans. <br /> The unit price for each Catch Basin Inlet shall be full pay for furnishing, hauling, and assembling <br /> in place the completed installation including all catch basin inlets, drainage grates, pipe <br /> connections, special fittings,joint materials and adjustment of inverts to catch basin inlets for the <br /> completion of the replacement of storm drainage features impacted by construction activities to <br /> the required lines and grades. <br /> The cost of removing existing catch basin inlet structure or abandoning is considered incidental <br /> to the cost of the new catch basin inlet. <br /> Excavation, stockpiling, hauling, dewatering, and backfill is incidental and shall be included in <br /> the unit price for this bid item. <br /> Adjusting all catch basin inlets to final grade is incidental and shall be included in the unit price <br /> for this bid item. <br /> The cost of connection of storm drain pipes to the catch basin inlet, except for drop connections, <br /> is incidental and shall be included in the unit price for this bid item. <br /> Measurement and payment shall be per each catch basin inlet installed as measured upon <br /> completion. <br /> Bid Item 30—EXISTING HAYES ST. REGULATOR STRUCTURE MODIFICATIONS <br /> Specification Section 7-05 <br /> Measurement and Payment: Lump Sum <br /> The Lump Sum price for Existing Hayes Street Regulator Structure Modifications shall be full <br /> compensation for all labor, material, tools and equipment necessary to satisfactorily complete the <br /> work as defined in the specifications and shown on the Plans, including all structure excavation; <br /> 1 removal and resetting existing structure riser and access appurtenances; and backfill. <br /> No specific unit of measure shall apply to the lump sum item of Existing Hayes Street Regulator <br /> Structure Modifications <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP -35 <br />