Laserfiche WebLink
I <br /> I <br /> Bid Item 31 —SHORING OR EXTRA EXCAVATION, CLASS B <br /> Specification Section 7-08 ! <br /> Measurement and Payment: Unit Price per Square Foot(SF) <br /> The unit Contract price per square foot shall be full pay for all excavation, backfill, compaction, <br /> and other Work required when extra excavation is used in lieu of constructing shoring. If select <br /> backfill material is required for backfilling within the limits of the Structure excavation, it shall <br /> also be required as backfill material for the extra excavation at the Contractor's expense. <br /> Bid Item 32 —CONTROL DENSITY FILL(CDF) FOR FILLING PIPES <br /> Specification Section 7-08 <br /> Measurement and Payment: Unit Price per Cubic Yard(CY) <br /> The unit Contract price per cubic yard shall be full pay for furnishing all labor, material, and <br /> equipment necessary for filling existing pipes and other uses as directed by the Engineer. <br /> Bid Item 33 —PVC SANITARY SEWER PIPE, 8-INCH DIA <br /> Bid Item 34—DIP PIPE FOR SEWER FORCEMAIN, 8-INCH DIA <br /> Bid Item 35—POLYPROPYLENE SEWER PIPE,30-INCH DIA <br /> Bid Item 36—POLYPROPYLENE SEWER PIPE, 48-INCH DIA I <br /> Bid Item 37—STEEL REINFORCED POLYETHYLENE PIPE, 72-INCH DIA <br /> Specification Section 7-17 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot for the type and size of sewer pipe shall be full compensation <br /> for all labor, material, incidentals, tools and equipment necessary to satisfactorily complete the <br /> work as defined in Section 7-17 of the Standard Specifications and these Special Provisions and <br /> as shown on the Plans. <br /> The unit price per linear foot of sewer pipe shall be full pay for furnishing, hauling, and <br /> assembling in place the completed installation including all wyes, tees, special fittings, joint <br /> materials and adjustment of inverts to manholes for the completion of the installation to the <br /> required lines and grades. <br /> The initial sawcutting of pavement, and removing and disposing of existing pavement, sidewalks <br /> and curbs is incidental. <br /> The unit price of sewer pipe shall also include, but not be limited to, all costs for trench <br /> excavation, removing and disposing of existing sewer pipe and existing manholes, hauling and <br /> disposing of surplus material, dewatering, furnishing, stockpiling, hauling, placing and <br /> compacting suitable native backfill, cleaning and flushing pipes and existing structures, testing <br /> and inspecting pipe, connecting pipe to and rechanneling of existing structures, reconnecting <br /> existing sanitary sewer, and replacing, protecting and maintaining utilities. Furnishing, hauling <br /> and placing of pipe zone bedding material (Crushed Surfacing Base Course) shall be paid under <br /> "Crushed Surfacing Base Course." <br /> All costs in jointing dissimilar types of sewer pipe with a coupling, adapter, or concrete collar f <br /> shall be included in the unit price for this bid item. <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP -36 <br />