R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> The unit price of sewer pipe shall also include costs for pot-holing and excavation required to <br /> determine exact depths and locations of other utilities and installing Ethafoam pads between pipe <br /> and existing utilities and abandonment of existing monitoring wells in conflict with proposed <br /> pipes shall be considered as incidental to the work and these costs shall be included in the unit <br /> contract price <br /> I� Measurement shall be linear feet of pipe, measured horizontally from station to station and will <br /> include the length through bends, tees and fittings. The Contractor will be responsible for <br /> providing sufficient materials for"true length"accounting for vertical change in pipe position. <br /> Measurement and payment will be based on horizontal length of sewer pipe constructed. <br /> ' Bid Item 38—SIDE SEWER CONNECTION <br /> Specification Section 7-18 <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each side sewer connection shall be full compensation for all labor, material, <br /> tools and equipment necessary to satisfactorily complete the work as defined in Section 7-18 of <br /> these Special Provisions and as shown on the Plans. <br /> Included in this bid item is locating the existing side sewer,replacing the side sewer as shown on <br /> the Contract Plans, connection to the main system and existing side sewer, furnishing and <br /> installing back-water valve and other fittings per Plan Details and COE Standard Drawings. <br /> Included in this bid item are all costs for trench excavation,removing and disposing of pavement <br /> sidewalk, curb, miscellaneous surfacing, landscape materials or sod, removing and disposing of <br /> existing side sewer pipe; hauling and disposing of surplus or unsuitable materials; excavation; <br /> dewatering; sewage bypassing; ; stockpiling, hauling, cleaning and flushing pipes; testing and <br /> inspecting and replacing; protecting and maintaining adjacent utilities. <br /> All costs in jointing dissimilar side sewer pipe with a coupling or concrete collar shall be <br /> included in the unit price for this bid item. <br /> Restoration of private improvements in streets and private property affected by side sewer <br /> construction and not otherwise included in other bid items, shall be considered incidental to this <br /> bid item. Except, where restoration of private improvements listed in item 1 under of Force <br /> Account Bid Item, and as authorized by the Engineer, that restoration work will be done by <br /> Force Account. <br /> Measurement for pay width of gravel borrow for trench backfill shall not exceed that necessary <br /> to meet trench safety requirements, COE Standard Drawings or Plan Details, whichever is <br /> greater. <br /> Bid Item 39—TEMPORARY FLOW BYPASS SYSTEMS, SIPHON HEADWORKS <br /> Specification Section 7-21 <br /> 1 Measurement and Payment: Lump Sum <br /> The lump sum bid item for Temporary Flow Bypass System, Siphon Headworks shall be full <br /> compensation for materials, work, labor and equipment necessary to furnish, install, and <br /> maintain two temporary gravity conveyance pipes (northside and southside of SHW structure) <br /> necessary to maintain the continual wastewater flow diversion of the siphon headworks facility <br /> and discharge to the downstream siphon pipe. <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SROI, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP -37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.