I <br /> Measurement for temporary sedimentation and erosion control shall be the ratio of the number of <br /> working days completed to the total number of working days authorized in the Contract. <br /> I <br /> Bid Item 42—CEMENT CONCRETE CURB AND GUTTER,TYPE A <br /> Specification Section 8-04 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot of Concrete Curb and Gutter, Type A-1 shall be full <br /> compensation for all labor, equipment, materials and incidentals, including forms, necessary to <br /> perform the work and shall include the replacement of concrete curbs or curb and gutter <br /> impacted by construction activities and curb ramp installation in accordance with the COE <br /> Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing and disposing of concrete curb and gutter, subgrade <br /> preparation and furnishing, placement, and compaction of crushed rock base is incidental and <br /> shall be included in the unit price for this bid item. Installation of curb depressions for driveway <br /> cuts and wheelchair ramps shall be incidental to these items and no separate payment will be <br /> made. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> Bid Item 43 —CHAIN LINK FENCE,TYPE 3 <br /> Specification Section 8-12 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot for chain link fence, Type 3 shall constitute full compensation <br /> for all labor, materials and equipment required to furnish and install as specified in the Standard <br /> Specifications, the Special Provisions and as shown on the Contract Plans. <br /> Bid Item 44—DOUBLE CHAIN LINK GATE, 6-FOOT <br /> Bid Item 45 —DOUBLE CHAIN LINK GATE, 12-FOOT <br /> Bid Item 46—DOUBLE CHAIN LINK GATE,20-FOOT <br /> Specification Section 8-12 <br /> Measurement and Payment: Unit Price per Each <br /> ' The unit price bid per each for double chain link gate, -foot shall constitute full compensation <br /> for all labor, materials and equipment required to furnish and install as specified in the Standard <br /> Specifications,the Special Provisions and as shown on the Contract Plans. <br /> Bid Item 47—CEMENT CONCRETE SIDEWALK, 4-INCH THICKNESS <br /> Specification Section 8-14 <br /> Measurement and Payment: Unit Price per Square Yard <br /> The unit price per square yard of Cement Concrete Sidewalk, 4-inch shall be full compensation <br /> for replacement or installation of concrete sidewalk, driveway or alley approach impacted by <br /> construction activities and/or shown on the Contract Plans in accordance with the COE Standard <br /> Drawings and these Special Provisions. <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 39 <br />