Laserfiche WebLink
I <br /> The cost of sawcutting, removing and disposing of sidewalk and driveways is included in <br /> Roadway Excavation Bid Item. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> Deductions will be made for blocked out areas, castings, or other discontinuities in the sidewalk I <br /> 9 square feet or larger. <br /> Measurements for"Gravel Borrow"to be used as fill for sidewalk subgrade will be by the ton as <br /> recorded on certified weight tickets per Section 1-09.1 and is included in Gravel Borrow Bid <br /> Item. <br /> The unit contract price for this Bid item shall include all costs for the work required to construct 1 <br /> the sidewalk as specified, including crushed surfacing top course; the earth work required to <br /> excavate excess material or place fill to achieve design subgrade elevations. <br /> Bid Item 48—CONCRETE CURB RAMP TYPE A <br /> Specification Section 8-14 <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each of Concrete Curb Ramp, Type shall be full compensation for <br /> replacement or installation of concrete sidewalk, driveway or alley approach, including crushed <br /> surfacing top course impacted by construction activities and/or shown on the Contract Plans in <br /> accordance with the COE Standard Drawings and these Special Provisions. <br /> Bid Item 49—CONDUIT INSTALLATION AND RELOCATION, <br /> FOR POWER AND TELEMETRY <br /> Specification Section 8-19 <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum unit price of Conduit Installation, for Power and Telemetry shall be full <br /> 111 <br /> compensation for new or relocated conduits impacted by construction activities and/or shown on <br /> the Contract Plans in accordance with these Special Provisions. <br /> Bid Item 50—PERMANENT PAVEMENT MARKINGS <br /> Specification Section 8-22 <br /> Measurement and Payment: Lump Sum (LS) <br /> This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br /> other equipment necessary for restoring and replacing permanent traffic marking, including and <br /> not limited to, stop bars, turn arrows, lettering, crosswalks, reflectors, delineators, and lane or <br /> fog-line striping removed or damaged by the Contractor's work in accordance with the COE <br /> Standard Drawing No. 720, Special Provisions and Plans. <br /> Bid Item 51 —TEMPORARY PAVEMENT MARKINGS <br /> Specification Section 8-23 <br /> Measurement and Payment: Lump Sum (LS) <br /> 111 <br /> HAYES STREET REGULATOR February, <br /> 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> 1 <br /> WO No—UP3398-31 SP - 40 <br />