Laserfiche WebLink
1 <br /> 1-02.12 Public Opening of Proposals , <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) 111 <br /> The City reserves the right to postpone the date and time for receiving or opening of Bids, or <br /> both, at any time prior to the date and time established in the Notice to Bidders. Postponement <br /> notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals <br /> Revise item 1 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and may be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; ' <br /> c. The completed proposal form contains any unauthorized additions,deletions, <br /> alternate Bids,or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award,or enter <br /> into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as <br /> required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete a Disadvantaged, Minority or <br /> Women's Business Enterprise Certification,as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet the <br /> material terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under the <br /> same or different names. <br /> 2. A Proposal may be considered irregular and may be rejected if: <br /> a. The Proposal does not include a unit price for every Bid item; <br /> b. Any of the unit prices are excessively unbalanced (either above or below the amount <br /> of a reasonable Bid)to the potential detriment of the Contracting Agency; <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership submit I <br /> Proposals for the same project(in such an instance,both Bids may be rejected); or <br /> e. If Proposal form entries are not made in ink. <br /> 1-02.14 Disqualification of Bidders <br /> Revise 1-02.14 to read as follows: <br /> A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br /> 1-02.15 Pre-Award Information <br /> Revise 1-02.15 to read as follows: <br /> 111 <br /> Before awarding any contract, the City may require one or more of these items or actions of the <br /> apparent lowest responsible Bidder: <br /> 1. A complete statement of the origin, composition, and manufacture of any or all <br /> materials to be used, <br /> 2. Samples of these materials for quality and fitness tests, <br /> HAVES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SROl, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP - 58 <br />