My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6275
>
Resolutions
>
Resolution 6275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 9:37:13 AM
Creation date
5/26/2017 9:36:43 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6275
Date
5/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Parks and Recreation Parks <br /> Operational Efficiency Plan • Determine if maintenance level for the facility will <br /> require irrigation. Locate irrigation to minimize need <br /> Operational efficiency planning will help the department to and locate irrigation equipment away from high visibility <br /> supply the best service possible within the boundaries of areas or areas with high vandalism. <br /> budget, capacity of the resources, staffing levels and <br /> equipment capabilities. Business Plan <br /> (SP1.6.2.2. Strategies) Business plans developed for major parks and programs will <br /> Measure the operational impact of new capital improvements help the department to balance costs to operate programs and <br /> prior to development to secure maintenance and operating services with revenues and possible partnership opportunities. <br /> funding commitment so as to not deplete existing funding These plans should define operational models, levels and type <br /> levels or overextend staff and equipment. of service, capital needs, preferred strategies for ongoing <br /> operations, future return on program investments, estimated <br /> • Involve maintenance and recreational staff in the revenues as compared to operations, capital and debt related <br /> design process so that maintenance and programming costs. Plans should be updated yearly to reflect changes in <br /> requirements are considered during the master costs, demographics and trends. <br /> planning and design processes. <br /> • Design park spaces to include maintenance reductions From Everett Parks Strategic Plan <br /> strategies such as mow edges, appropriate path widths <br /> for maintenance vehicle access, accessible locations 1.7. Funding Strategies <br /> for garbage cans and proper plant selection. <br /> • Inspect every park feature as needed to provide safe 1. Seek the maximum possible trail easements to tie up <br /> facilities and guide capital improvements. land for trail granting purposes and to meet <br /> • Determine who will specifically perform the development goals for trails as outlined in the facility <br /> maintenance and involve them in design review. standards <br /> • Encourage volunteerism while providing a back-up plan 2. Seek trail financing through the sale of development <br /> for maintenance should volunteer's tire of doing so, rights below the trail for fiber optic and utility <br /> relocate to another community, or otherwise become easements <br /> unavailable. 3. Seek sponsorships for trail development and <br /> • Consider both the maintenance for the proposed maintenance operations on a per mile basis <br /> project and how it will impact existing maintenance 4. Establish a maintenance endowment through fees to <br /> practices. support capital improvement costs associated with <br /> • All proposed site fixtures shall be durable and resistant sports complexes and replacement costs <br /> to vandalism, graffiti and theft. 5. Seek partnership fairness of user groups in developing <br /> • Fixtures and components should be readily replaceable facilities <br /> in the event of damage. <br /> 22 Everett Parks and Recreation <br />
The URL can be used to link to this page
Your browser does not support the video tag.