CITY OF EVERETT SPECIAL PROVISIONS
<br /> bedding and backfill materials; plastic film wrap; and thermoplastic powder coating required
<br /> for the complete installation of the hydrant assembly as specified.
<br /> Work and materials to be included with this bid item removal or salvage, handling and
<br /> disposal of the existing hydrant and disposal of or abandoning in place pipe, fittings, and
<br /> valve.
<br /> Bid Item 21 - Service Saddle and Valve Assembly, 2-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Service Saddle and Valve Assembly, 2-Inch, shall constitute full
<br /> compensation for all labor, materials, tools, and equipment necessary for providing
<br /> assembly in accordance with Notes A, B, C and L of COE Standard Drawing No. 502
<br /> including yet not limited to, furnishing and installing the service saddle and corporation
<br /> stop; trench excavation and dewatering, pavement removal, backfill and compaction; and
<br /> testing the connection.
<br /> Bid Item 22 - Air Vacuum Valve Assembly, 1-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Air Vacuum Valve Assembly, 1-Inch shall constitute full
<br /> compensation for all labor, materials, tools and equipment necessary for providing
<br /> assembly in accordance with COE Std Drawing No. 512 or as modified and supplemented
<br /> herein, in the location shown on the Plans, including but not limited to, all gaskets, bolts,
<br /> pipe, nipples, adapters, couplings, fittings, restraint systems, vertical bends, all other
<br /> necessary appurtenances, temporary thrust blocking, trench excavation, sheeting and
<br /> shoring and dewatering, backfill and compaction of native material, maintenance,
<br /> restoration and relocation, if required, of culverts, storm drainage pipe, other utilities and
<br /> structures, pressure and purity testing, including temporary blow-offs necessary for testing,
<br /> extra depth excavation, backfill and compaction required to clear buried utilities or other
<br /> obstructions and cutting, and removal and disposal of existing pipe.
<br /> Bid Item 23 - Assist COE Water Operations in Connection to Existing
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Connection to Existing Water Main shall constitute full
<br /> compensation for all labor, materials, tools and equipment necessary for connection to
<br /> existing system, in accordance with 7-09.3(19)A including, yet not limited to; all costs for
<br /> traffic control, excavation, shoring, dewatering, haul and disposal of excavated materials,
<br /> cutting existing, draining water and properly disposing of existing pipe; furnishing, installing
<br /> and compacting bedding and backfill materials; labor and equipment required for the
<br /> complete installation of the connection and abandonment of the existing main as specified.
<br /> Unit contract price shall include all coordination efforts with the City and assistance as City
<br /> forces make the actual connection.
<br /> Bid Item 24 - Connect to Existing Hydrant Lead
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Connection to Existing Hydrant Lead shall constitute full
<br /> compensation for all labor, materials, tools and equipment necessary for connection to
<br /> existing system, in accordance with COE Standard Drawing 507 from the new main up to
<br /> the connection point on the existing hydrant lead, including, yet not limited to; all costs for
<br /> traffic control, excavation, shoring, dewatering, haul and disposal of excavated materials,
<br /> cutting existing, draining water and properly disposing of existing pipe; furnishing, installing
<br /> and compacting bedding and backfill materials; labor and equipment required for the
<br /> complete installation of the connection.
<br /> Water Main Replacement"R" Division B—BID DESCRIPTIONS March 1, 2017
<br /> WO No.—UP3646 SP-9