Laserfiche WebLink
1 Final Acceptance Date <br /> 2 The date on which the Contracting Agency accepts the Work as complete. <br /> 3 <br /> 4 Supplement this Section with the following: <br /> 5 <br /> 6 All references in the Standard Specifications, Amendments, or WSDOT General <br /> 7 Special Provisions, to the terms "State", "Department of Transportation", <br /> 8 "Washington State Transportation Commission", "Commission", "Secretary of <br /> 9 Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be <br /> 10 revised to read "Contracting Agency". <br /> 11 <br /> 12 All references to "State Materials Laboratory" shall be revised to read <br /> 13 "Contracting Agency designated location". <br /> 14 <br /> 15 All references to "final contract voucher certification" shall be interpreted to <br /> 16 mean the final payment form established by the Contracting Agency. <br /> 17 <br /> 18 The venue of all causes of action arising from the advertisement, award, <br /> 19 execution, and performance of the contract shall be in the Superior Court of the <br /> 20 County where the Contracting Agency's headquarters are located. <br /> 21 <br /> 22 Additive <br /> 23 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> 24 Proposal, which may, at the discretion of the Contracting Agency, be awarded in <br /> 25 addition to the base bid. <br /> 26 <br /> 27 Alternate <br /> 28 One of two or more units of work or groups of bid items, identified separately in <br /> 29 the Bid Proposal, from which the Contracting Agency may make a choice <br /> 30 between different methods or material of construction for performing the same <br /> 31 work. <br /> 32 <br /> 33 Business Day <br /> 34 A business day is any day from Monday through Friday except holidays as listed <br /> 35 in Section 1-08.5. <br /> 36 <br /> 37 Contract Bond <br /> 38 The definition in the Standard Specifications for"Contract Bond" applies to <br /> 39 whatever bond form(s) are required by the Contract Documents, which may be a <br /> 40 combination of a Payment Bond and a Performance Bond. <br /> 41 <br /> 42 Contract Documents <br /> 43 See definition for "Contract". <br /> 44 <br /> 45 Contract Time <br /> 46 The period of time established by the terms and conditions of the Contract within <br /> 47 which the Work must be physically completed. <br /> 48 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 3 <br />