Laserfiche WebLink
1 Notice of Award <br /> 2 The written notice from the Contracting Agency to the successful Bidder <br /> 3 signifying the Contracting Agency's acceptance of the Bid Proposal. <br /> 4 <br /> 5 Notice to Proceed <br /> 6 The written notice from the Contracting Agency or Engineer to the Contractor <br /> 7 authorizing and directing the Contractor to proceed with the Work and <br /> 8 establishing the date on which the Contract time begins. <br /> 9 <br /> 10 Traffic <br /> 11 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> 12 wheelchairs, and equestrian traffic. <br /> 13 <br /> 14 <br /> 15 <br /> 16 1-02.1.RTF <br /> 17 1-02 BID PROCEDURES AND CONDITIONS <br /> 18 <br /> 19 1-02.1 Prequalification of Bidders <br /> 20 <br /> 21 Delete this Section and replace it with the following: <br /> 22 <br /> 23 1-02.1 Qualifications of Bidder <br /> 24 (January 24, 2011 APWA GSP) <br /> 25 <br /> 26 Before award of a public works contract, a bidder must meet at least the <br /> 27 minimum qualifications of RCW 39.04.350(1) to be considered a responsible <br /> 28 bidder and qualified to be awarded a public works project. <br /> 29 <br /> 30 1-02.2.docx <br /> 31 1-02.2 Plans and Specifications <br /> 32 (June 27, 2011 APWA GSP) <br /> 33 <br /> 34 Delete this section and replace it with the following: <br /> 35 <br /> 36 Information as to where Bid Documents can be obtained or reviewed can be <br /> 37 found in the Call for Bids (Advertisement for Bids) for the work. <br /> 38 <br /> 39 After award of the contract, plans and specifications will be issued to the <br /> 40 Contractor at no cost as detailed below: <br /> 41 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 8 Furnished automatically <br /> upon award. <br /> Contract Provisions 4 Furnished automatically <br /> upon award. <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 4 <br />