Laserfiche WebLink
Large plans (e.g., 22" x 2 Furnished only upon <br /> 34") request. <br /> 1 <br /> 2 Additional plans and Contract Provisions may be obtained by the Contractor <br /> 3 from the source stated in the Call for Bids, at the Contractor's own expense. <br /> 4 <br /> 5 <br /> 6 Examination of Plans, Specifications and Site of Work <br /> 7 <br /> 8 <br /> 9 1-02.5.RTF <br /> 10 1-02.5 Proposal Forms <br /> 11 (June 27, 2011 APWA GSP) <br /> 12 <br /> 13 Delete this section and replace it with the following: <br /> 14 <br /> 15 The Proposal Form will identify the project and its location and describe the <br /> 16 work. It will also list estimated quantities, units of measurement, the items of <br /> 17 work, and the materials to be furnished at the unit bid prices. The bidder shall <br /> 18 complete spaces on the proposal form that call for, but are not limited to, unit <br /> 19 prices; extensions; summations; the total bid amount; signatures; date; and, <br /> 20 where applicable, retail sales taxes and acknowledgment of addenda; the <br /> 21 bidder's name, address, telephone number, and signature; the bidder's <br /> 22 D/M/WBE commitment, if applicable; a State of Washington Contractor's <br /> 23 Registration Number; and a Business License Number, if applicable. Bids shall <br /> 24 be completed by typing or shall be printed in ink by hand, preferably in black ink. <br /> 25 The required certifications are included as part of the Proposal Form. <br /> 26 <br /> 27 The Contracting Agency reserves the right to arrange the proposal forms with <br /> 28 alternates and additives, if such be to the advantage of the Contracting Agency. <br /> 29 The bidder shall bid on all alternates and additives set forth in the Proposal <br /> 30 Form unless otherwise specified. <br /> 31 <br /> 32 <br /> 33 1-02.6.OPT10.GR1 <br /> 34 1-02.6 Preparation of Proposal <br /> 35 <br /> 36 (May 7, 2012) <br /> 37 The Bidder shall submit with the Bid a completed Disadvantaged Women's <br /> 38 Business Enterprise (DWBE) Contact Form, when required by the Special <br /> 39 Provisions. <br /> 40 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 5 <br />