My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> 2 applicable, as required in Section 1-02.6; <br /> 3 h. The Bidder fails to submit or properly complete a Disadvantaged <br /> 4 Business Enterprise Certification, if applicable, as required in Section <br /> 5 1-02.6; <br /> 6 i. The Bidder fails to submit written confirmation from each DBE firm <br /> 7 listed on the Bidder's completed DBE Utilization Certification that <br /> 8 they are in agreement with the bidders DBE participation <br /> 9 commitment, if applicable, as required in Section 1-02.6, or if the <br /> 10 written confirmation that is submitted fails to meet the requirements <br /> 11 of the Special Provisions; <br /> 12 j The Bidder fails to submit DBE Good Faith Effort documentation, if <br /> 13 applicable, as required in Section 1-02.6, or if the documentation that <br /> 14 is submitted fails to demonstrate that a Good Faith Effort to meet the <br /> 15 Condition of Award was made; <br /> 16 k. The Bid Proposal does not constitute a definite and unqualified offer <br /> 17 to meet the material terms of the Bid invitation; or <br /> 18 I. More than one proposal is submitted for the same project from a <br /> 19 Bidder under the same or different names. <br /> 20 <br /> 21 2. A Proposal may be considered irregular and may be rejected if: <br /> 22 a. The Proposal does not include a unit price for every Bid item; <br /> 23 b. Any of the unit prices are excessively unbalanced (either above or <br /> 24 below the amount of a reasonable Bid) to the potential detriment of <br /> 25 the Contracting Agency; <br /> 26 c. Receipt of Addenda is not acknowledged; <br /> 27 d. A member of a joint venture or partnership and the joint venture or <br /> 28 partnership submit Proposals for the same project (in such an <br /> 29 instance, both Bids may be rejected); or <br /> 30 e. If Proposal form entries are not made in ink. <br /> 31 <br /> 32 <br /> 33 <br /> 34 1-02.14 OptA.RTF <br /> 35 1-02.14 Disqualification of Bidders <br /> 36 (March 8, 2013 APWA GSP, Option A) <br /> 37 <br /> 38 Delete this Section and replace it with the following: <br /> 39 A Bidder will be deemed not responsible if the Bidder does not meet the <br /> 40 mandatory bidder responsibility criteria in RCW 39.04.350(1), as amended. <br /> 41 <br /> 42 As evidence that the Bidder meets the mandatory bidder responsibility criteria, <br /> 43 the apparent two lowest Bidders must submit to the Contracting Agency within <br /> 44 24 hours of the bid submittal deadline, documentation (sufficient in the sole <br /> 45 judgment of the Contracting Agency) demonstrating compliance with all <br /> 46 responsibility criteria. The Contracting Agency reserves the right to request such <br /> 47 documentation from other Bidders as well, and to request further documentation <br /> 48 as needed to assess bidder responsibility. The Contracting Agency also reserves <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.