My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 the right to obtain information from third parties concerning a Bidder's <br /> 2 compliance with the mandatory bidder responsibility criteria. <br /> 3 <br /> 4 If the Contracting Agency determines the Bidder does not meet the mandatory <br /> 5 bidder responsibility criteria in RCW 39.04.350(1) and is therefore not a <br /> 6 responsible Bidder, the Contracting Agency shall notify the Bidder in writing, with <br /> 7 the reasons for its determination. If the Bidder disagrees with this determination, <br /> 8 it may appeal the determination within two (2) business days of the Contracting <br /> 9 Agency's determination by presenting its appeal and any additional information <br /> 10 to the Contracting Agency. The Contracting Agency will consider the appeal and <br /> 11 any additional information before issuing its final determination. If the final <br /> 12 determination affirms that the Bidder is not responsible, the Contracting Agency <br /> 13 will not execute a contract with any other Bidder until at least two business days <br /> 14 after the Bidder determined to be not responsible has received the Contracting <br /> 15 Agency's final determination. <br /> 16 <br /> 17 <br /> 18 <br /> 19 1-02.15.RTF <br /> 20 1-02.15 Pre Award Information <br /> 21 (August 14, 2013 APWA GSP) <br /> 22 <br /> 23 Revise this section to read: <br /> 24 <br /> 25 Before awarding any contract, the Contracting Agency may require one or more <br /> 26 of these items or actions of the apparent lowest responsible bidder: <br /> 27 1. A complete statement of the origin, composition, and manufacture of any or <br /> 28 all materials to be used, <br /> 29 2. Samples of these materials for quality and fitness tests, <br /> 30 3. A progress schedule (in a form the Contracting Agency requires) showing <br /> 31 the order of and time required for the various phases of the work, <br /> 32 4. A breakdown of costs assigned to any bid item, <br /> 33 5. Attendance at a conference with the Engineer or representatives of the <br /> 34 Engineer, <br /> 35 6. Obtain, and furnish a copy of, a business license to do business in the city or <br /> 36 county where the work is located. <br /> 37 7. Any other information or action taken that is deemed necessary to ensure <br /> 38 that the bidder is the lowest responsible bidder. <br /> 39 <br /> 40 <br /> 41 1-03.1(1).RTF <br /> 42 <br /> 43 1-03.1(1) Identical Bid Totals <br /> 44 (January 4, 2016 APWA GSP) <br /> 45 <br /> 46 Revise this section to read: <br /> 47 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.