My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Delete the sixth and seventh paragraphs of this section <br /> 2 <br /> 3 1-05.14.GR1 <br /> 4 Cooperation With Other Contractors <br /> 5 <br /> 6 1-05.14.INST1.GR1 <br /> 7 Section 1-05.14 is supplemented with the following: <br /> 8 <br /> 9 1-05.14.optl.FR1 <br /> 10 (March 13, 1995) <br /> 11 Other Contracts Or Other Work <br /> 12 It is anticipated that the following work adjacent to or within the limits of this <br /> 13 project will be performed by others during the course of this project and will <br /> 14 require coordination of the work: <br /> 15 <br /> 16 SR 526/5th Ave W Vicinity to 1-5 — Paving <br /> 17 Washington State Department of Transportation <br /> 18 Tim Nau, WSDOT Construction Project Engineer, (425)225-8726 <br /> 19 9021 El Capitan Way, Everett, WA 98208 <br /> 20 <br /> 21 <br /> 22 <br /> 23 1-05.15.RTF <br /> 24 1-05.15 Method of Serving Notices <br /> 25 (March 25, 2009 APWA GSP) <br /> 26 Revise the second paragraph to read: <br /> 27 <br /> 28 All correspondence from the Contractor shall be directed to the Project <br /> 29 Engineer. All correspondence from the Contractor constituting any notification, <br /> 30 notice of protest, notice of dispute, or other correspondence constituting <br /> 31 notification required to be furnished under the Contract, must be in paper format, <br /> 32 hand delivered or sent via mail delivery service to the Project Engineer's office. <br /> 33 Electronic copies such as e-mails or electronically delivered copies of <br /> 34 correspondence will not constitute such notice and will not comply with the <br /> 35 requirements of the Contract. <br /> 36 <br /> 37 1-05.16.RTF <br /> 38 Add the following new section: <br /> 39 <br /> 40 1-05.16 Water and Power <br /> 41 (October 1, 2005 APWA GSP) <br /> 42 <br /> 43 The Contractor shall make necessary arrangements, and shall bear the costs for <br /> 44 power and water necessary for the performance of the work, unless the contract <br /> 45 includes power and water as a pay item. <br /> 46 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.