Laserfiche WebLink
I <br /> 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT <br /> ITRANSPORTATION SYSTEMS AND ELECTRICAL <br /> 8-20.2 Materials SP 8 - 3 <br /> 1 8-20.3 Construction Requirements SP 8—4 <br /> 8-20.4 Measurement SP 8—5 <br /> 8-20.5 Payment SP 8—5 <br /> I8-22 PAVEMENT MARKING <br /> 1 8-22.2 Materials SP 8—6 <br /> 8-22.3 Construction Requirements SP 8 - 6 <br /> 1 8-22.3(2) Preparation of Roadway Surfaces SP 8 - 7 <br /> 8-22.4 Measurement SP 8—7 <br /> 111 8-22.5 Payment SP 8—7 <br /> I8-23 TEMPORARY PAVEMENT MARKING <br /> 1 8-23.2 Materials SP 8 —7 <br /> 8-23.5 Payment SP 8 —8 <br /> I <br /> 8-26 RESOLVE ABOVE GROUND CONFLICTS (NEW SECTION) <br /> 1 8.26.1 Description SP 8—8 <br /> 8.26.2 Resolve Above Ground Conflicts SP 8—8 <br /> I8.26.3 Vacant SP 8—8 <br /> 8.26.4 Measurement SP 8 — 8 <br /> 1 8.26.5 Payment SP 8 — 8 <br /> 8-27 UNIFORMED POLICE OFFICER <br /> I 8.27.1 Description SP 8 —9 <br /> 8.27.3 Construction Requirements SP 8 —9 <br /> 8.27.4 Measurement SP 8—9 <br /> I8.27.5 Payment SP 8—9 <br /> I <br /> IHOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> Work Order#PW 3642 <br /> Table of Contents <br /> I <br />