American Process Group Inc 6/15/2017 Change Order 1
>
Contracts
>
Capital Contract
>
American Process Group Inc 6/15/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 10:27:21 AM
Creation date
6/19/2017 10:27:19 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Processing Group Inc
Approval Date
6/15/2017
Council Approval Date
6/7/2017
Department
Public Works
Department Project Manager
Chris Chesson
Subject / Project Title
2017 Biosolids Removal
Public Works WO Number
WO2600-4-1
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000496
Total Compensation
$34,334.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group, Inc. 2/22/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:2017 Biosolids Removal <br /> Change Order No. 1 <br /> Change Order Effective Date:June, 2017 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A, including all <br /> direct and indirect costs and impacts, the contract price shall be adjusted as described <br /> in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> / <br /> Mayr ` ,. City Clerk ity Attorne <br /> Date: ` 't 1-frw Date: /S W/9— Dae: ` 12 ' <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Date: Date: Date: Date: <br /> CONTRACTOR <br /> By Date: ley ( 7 <br /> Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.