Laserfiche WebLink
B. Use policies and regulations <br /> 1. Development activities <br /> a. Boating facilities <br /> b. Commercial development <br /> c. Piers and docks <br /> d. Recreational development <br /> e. Residential development <br /> f. Land clearing and grading activities within <br /> and adjacent to shoreline <br /> g. Public access to shoreline <br /> h. Signs <br /> i. Transportation facilities <br /> j . Utilities <br /> 2 . Shoreline modification facilities <br /> a. Bulkheads <br /> b. Dredging <br /> c. Landfill <br /> d. Shoreline stabilization and flood protection <br /> Task III: Develop standards and regulations to implement shoreline <br /> policy as overlay of present zoning. <br /> Task IV: Develop Shoreline Access Standards and Conceptual Design <br /> of a pedestrian trail that would go completely around <br /> Silver Lake. <br /> Task V: Develop a camera ready copy brochure to communicate the <br /> importance of Silver Lake as a community water resource <br /> and the benefits of public access and the Shoreline Mas- <br /> ter Program. <br /> Task VI: Prepare draft revision of shoreline master program. <br /> BUDGET <br /> Salaries and Benefits $ 6, 429 <br /> Contractual Services 14, 000 <br /> Materials/Supplies/Painting & Copying 1. 000 <br /> TOTAL $21, 429 <br /> STATE SHARE @ 70% = $15, 000 <br /> GRANTEE SHARE @ 30% = 6,429 <br /> A-2 <br />