My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2883
>
Resolutions
>
Resolution 2883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2017 11:26:45 AM
Creation date
7/6/2017 11:26:37 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2883
Date
7/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 8 v <br /> CITY OF EVERETT <br /> PLANNING COMMISSION <br /> PUBLIC HEARING <br /> MAY 27, 1987 <br /> Location: Public Conference Room Time: 12:00 Noon <br /> 2nd Floor, City Hall <br /> AGENDA <br /> Shoreline Permit #3-87 <br /> Applicant: Pacific Northwest Bell Telephone Company (PNB) <br /> 1703 - 1600 Bell Plaza <br /> Seattle, WA 98191 <br /> Project: Placement of buried fiber optic cable in conduits from <br /> Seattle to Bellingham <br /> Project Location: <br /> The portion within the City of Everett will extend southeast from the <br /> intersection of Summit Avenue and East Marine View Drive in the public <br /> right-of-way to the I-5 bridge where it turns to the northeast. Conduit will be <br /> attached to the east side of the bridge to carry the cable over the river to a <br /> pier column on the north side of the bridge where it will again go to buried <br /> cable in the public right-of-way in an easterly direction. The buried cable <br /> will continue in a northerly direction in an easement to 12th Street N.E. <br /> 26526 <br /> 6 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.