Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v. Sheet No. 115 (Drawing S3.23) <br /> 3. Replace Sheet No. 145 with attached: Drawing S3.53 has been revised with run-off <br /> diversion plate detail and handhole cover plate detail. <br /> 4. On Sheet No. 34 "Plant Schedule", Delete "HHI — Hypericum Hidcote (Hidcote St. <br /> Johnswort) — 2 Gal pots— 7 EA" (Drawing L1.05). <br /> CLARIFICATIONS <br /> Question 1 <br /> Will there be a Division 26 Specification Section issued for the Electrical work (Conduit, Wiring, <br /> Distribution Equipment, Interior Lighting, etc.) that is done inside of the Elevator Tower? <br /> Answer—No additional Division 26 specifications will be provided. <br /> Question 2 <br /> Could you provide a description of Bid Items A95 and B7, so we know what's included in each <br /> one? Or, were you just looking for us to come up with a total cost of the steel and apply 80% <br /> of the cost to Bid Item A95 and 20% of the cost to Bid Item B7? <br /> Answer—Determine a single lump sum price for all Structural Low Alloy Steel, Grade 50 or <br /> 50W, per Sheet 0.01. 80% will be paid under bid item A95 and 20% will be paid under Bid <br /> Item B7. <br /> Question 3 <br /> Can 1.8M sectional casing be used as the temporary casing for the 6'diameter drilled shafts? <br /> Answer—Yes. <br /> Question 4 <br /> Reference S7.01-S7.03. We assume all SD, CS, and CSFM pipe support material shown on these <br /> drawings is to be provided per Division 7 Special Provisions and paid for under Bridge <br /> Supported Steel Pipe Bid Items A41, A67, and A69. Please confirm. <br /> Answer—Confirmed. SD, CS, and CSFM pipe support material will be paid for under Bid Items <br /> A41, A67, and A69 respectively. <br /> Question 5 <br /> Reference S3.45, Grating Walkway Detail. Please provide additional information on the type of <br /> walkway grating required (e.g. bearing bar and cross bar size and spacing). <br /> Answer—See note below "Grating Walkway Detail". Contractor to size grating appropriately <br /> for the span, and submit design to the Engineer for approval. <br /> Question 6 <br /> Reference S3.03 (& similar). The HS bolts at the box truss members cannot be torqued from <br /> the inside as there is insufficient clearance for the torquing equipment (as little as 12-1/2" <br /> between chord webs). We assume in these cases, the nuts may be placed on the outside of the <br /> connection to facilitate torquing. Please confirm. <br /> Answer—Nuts are to be placed inside. If no industry available torque or shear wrench can <br /> work due to space limitations then a consistent pattern must be established between the <br /> engineer and contractor regarding a nut pattern visible from the outside. Random reversing of <br /> nuts and bolts is not permitted. <br /> City of Everett Addendum No. 2 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.