My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 7 <br /> Would the City of Everett consider a stay-in-place deck pan form system for the pedestrian <br /> walkways on the bridge? <br /> Answer—Yes, if galvanized. <br /> Question 8 <br /> What concerns does the City of Everett have with potential cracking of the concrete deck if it is <br /> placed while the truss is on the ground and then lifted into final position by the transporters? <br /> Answer—A cracked deck will not be accepted. <br /> Question 9 <br /> To give an accurate assessment of the architectural panels it is critical to determine the linear <br /> inches composing each panel. If we had access to a dxf file we could give you a true cost. <br /> Answer—The City does not give out CAD files during the bid. Last line on page S152 of the <br /> specifications states: "Pattern: Architect to provide digital file for perforations pattern to <br /> Contractor." This will be provided once the contract is executed. <br /> Question 10 <br /> Do you know if the steel bridge is to be shop painted or painted after bridge erection? <br /> Answer—This is determined by complying with the specifications and Contractor's sequence <br /> and means and methods for construction. <br /> Question 11 <br /> Reference S1.17. We assume that all U1 bearing material on this drawing is paid for under Bid <br /> Item A95. Please confirm. <br /> Answer—Confirmed. The Bearing shown on S.17 is to be paid for under bid item A95. <br /> Question 12 <br /> Will there be a Division 26 Specification Section issued for the Electrical work (Conduit, Wiring, <br /> Distribution Equipment, Interior Lighting, etc.) that is done inside of the Elevator Tower? <br /> Answer—No additional Division 26 Specifications will be provided. <br /> Question 13 <br /> General Note 4 on Sheets 192 through 194 Direct us to provide a bonding jumper for the Bridge <br /> Guardrail panels and tie them into the Bridge structural steel. It also refers us to Sheet A5.2. <br /> Detail 13/A5.2 is the only detail that shows a bonding jumper, and it states "space as required. <br /> Refer to electrical, typ."The only place that these bonding jumpers are mentioned is in the <br /> original General Note 4. Please provide details/specifications that will address how to bond, <br /> where to bond and what materials we are to use in order to provide the required bonding. <br /> Answer—Contractor shall determine/coordinate method of mechanical bonding of bridge <br /> guardrail panels with bridge mechanical or structural steel systems. The Engineer will review <br /> and approve. <br /> Question 14 <br /> Special Provisions 7-08.5. `Structure Excavation Class B Incl. Haul"states it includes"all <br /> temporary trench support systems". Bid Item A171 "Shoring or Extra Excavation Class B" has <br /> been established to cover this work. The Special Provisions and bid item appear to be in <br /> conflict. Please clarify. <br /> City of Everett Addendum No. 2 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.