Laserfiche WebLink
Question 3 <br /> What material is to be used to backfill around the bridge abutments? <br /> Answer—The backfill around the bridge abutments is as stated in 2-10.3(1)E <br /> Backfilling...backfill material shall be non-clay material containing no pieces more than 3 inches <br /> across, no frozen lumps, and no wood or other foreign material." When the material from <br /> structure excavation is un-suitable (does not meet the description above) then "Alternative <br /> Sources" may be used, per Section 2-10.3(1)EBackfilling. <br /> COURTESY INFORMATION <br /> It is the responsibility of the contractor to pursue additional areas that may be needed for <br /> construction, working directly with private property owners on those arrangements and <br /> including associated costs in the bid. As a courtesy, the Port of Everett is providing an <br /> Information Sheet about property that may be available. The Information Sheet can be <br /> obtained at the following link: <br /> http://www.portofeverett.com/Home/ShowDocument?id=9774 <br /> All other requirements of the contract documents remain in effect. <br /> KPFF Consulting Engineers <br /> dro <br /> £ <br /> 28670 <br /> 70 ``I STEit$'• <br /> eSSIONAL v�� <br /> Tom Whiteman, P.E. <br /> Project Manager <br /> City of Everett Addendum No. 6 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 2 <br />