My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID PROPOSAL <br /> Replace the Bid Proposal form with the attached replacements for pages P8 and P10. The Bid <br /> List has been revised as follows: <br /> 1. Bid Item No. A152, the quantity is revised from "3,900"to"5,020". <br /> 2. Add Bid Item No. A208: Section 6-02 SP, "Pedestrian Waterproof Coating", 60 SF. <br /> APPENDICES <br /> 1. Replace Appendix G2 with the attached 16 pages: Appendix G2 - 1 through Appendix <br /> G2 - 16 (executed Pipeline License). <br /> CONTRACT PLANS <br /> 1. Replace Sheet No. 56 with attached: Drawing A5.0 has been revised to clarify the <br /> guardrail perforated panels. <br /> 2. Replace Sheet No. 57 with attached: Drawing A5.1 has been revised to clarify the <br /> guardrail perforated panels. <br /> 3. Replace Sheet No. 63 with attached: Drawing S0.01 has been revised to clarify <br /> the Painting Program. <br /> 4. Replace Sheet No. 70 with attached: Drawing S1.03 has been revised to clarify <br /> the elevator door opening. <br /> 5. Replace Sheet No. 73 with attached: Drawing S1.06 has been revised to clarify <br /> the elevator door opening. <br /> 6. Replace Sheet No. 74 with attached: Drawing S1.07 has been revised to add <br /> anchor reinforcement details. <br /> 7. Replace Sheet No. 78 with attached: Drawing S1.11 has been revised to clarify <br /> the elevation view. <br /> 8. Replace Sheet No. 85 with attached: Drawing S1.18 has been revised to clarify <br /> the roof metal deck. <br /> 9. Replace Sheet No. 86 with attached: Drawing S1.19 has been revised to clarify <br /> the elevator door opening. <br /> 10. Replace Sheet No. 89 with attached: Drawing S2.01 has been revised to clarify <br /> the vertical bracing. <br /> 11. Replace Sheet No. 93 with attached: Drawing S3.01 has been revised to clarify <br /> the member labels. <br /> 12. Replace Sheet No. 158 with attached: Drawing 55.06 has been revised to add the <br /> deck slab reinforcement detail. <br /> 13. Replace Sheet No. 160 with attached: Drawing S5.08 has been revised to add <br /> deck slab section. <br /> 14. Replace Sheet No. 162 with attached: Drawing S6.01 has been revised to call out <br /> a detail and a section for the West Landing Plan. <br /> 15. Replace Sheet No. 164 with attached: Drawing 56.03 has been revised to clarify <br /> the anchor plate details. <br /> 16. Replace Sheet No. 166 with attached: Drawing S6.05 has been revised to add <br /> sections and details to the anchor plates. <br /> 17. Replace Sheet No. 169 with attached: Drawing S6.08 has been revised to clarify <br /> the stair details. <br /> City of Everett Addendum No. 8 <br /> Grand Avenue Park Bridge Project Bid Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.