Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7. Temporary and permanent thrust blocking and dead man blocks, and temporary and II <br /> permanent restraint systems. <br /> 8. Ethafoam pads or sand backfill between water main and other pipes. <br /> 9. Maintenance of existing water main and provisions for interim water service. <br /> 10. Pressure and purity testing of all water mains and shall include providing temporary <br /> blow-offs, backflow prevention, air gap apparatus, flushing, and disinfecting as <br /> necessary for testing in accordance with 7-09.3(24) of the Special Provisions. 111 <br /> 11. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 12. Work required to avoid unexpected or unforeseen obstacles shall be paid for under the I <br /> Force Account item. The costs for potholing and excavation required to determine <br /> exact depths and locations of other utilities shall be included with this Work with no <br /> direct compensation made. I <br /> Bid Item 21 - Storm Drain Pipe, 12-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Measurement for furnishing and installing storm drain pipe will be based on lineal footage <br /> measured horizontally along the invert of the installed pipe from center of catch <br /> basin/manhole to center of catch basin/manhole. <br /> The unit contract price for storm drain pipe shall constitute full compensation for all labor, <br /> materials, tools and equipment necessary to furnish and install the pipe and all fittings, <br /> required for complete installation along the run of each pipe size, as shown on the Plans <br /> and specified herein, and additionally, shall include, but not be limited to, the following: <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of thrust blocks, <br /> miscellaneous landscaping, and sod as indicated on the Plans. <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> 3. Utility or light pole protection in conformance with the requirements of the applicable <br /> utility including, if necessary, arranging for the utility to protect poles and paying the <br /> associated fees. <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting backfill for pipe bedding, furnishing, placing and compacting suitable <br /> native material for trench backfill and placing and compacting imported backfill <br /> material. <br /> 5. Steel sheeting for covering open excavations left overnight to protect public from injury I <br /> and property damage. <br /> 6. Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br /> drainage pipe, other utilities and structures affected by construction that are to remain. <br /> 7. Ethafoam pads or sand backfill between storm drain pipe and other pipes. <br /> 8. Testing of pipe in conformance with the contract documents. <br /> 9. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 10. Work required to avoid unexpected or unforeseen obstacles shall be paid for under the <br /> Force Account item. The costs for pot-holing and excavation required to determine <br /> exact depths and locations of other utilities shall be included with this Work with no <br /> direct compensation made. <br /> Bid Item 22 - Combined Sewer Pipe, 36-Inch Diam. <br /> Bid Item 23 - Combined Sewer Pipe, 48-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.