Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS I <br /> Measurement for temporary sewer flow bypassing will be based on the percentage of total I <br /> Work complete, by dollar value, at the time of measurement. Any remainder will be paid <br /> when new combined sewer facilities are accepted by the City and all temporary sewer flow ' <br /> bypassing components are removed. <br /> Payment for temporary sewer flow bypassing will be made at the measured percentage <br /> amount for the pay period times the lump sum amount bid. Said payment shall be <br /> complete compensation for a complete sewer flow bypassing plan, all labor, materials, <br /> equipment, pumps, bypasses, etc. necessary to maintain the continual wastewater flow and <br /> to prevent wastewater discharge to the environment throughout the duration of constructing <br /> new or rehabilitating existing combined sewers within the Project in accordance with theIl <br /> Contract Documents. <br /> Bid Item 26 - Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the I <br /> work descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported I <br /> gravel borrow for trench backfill where Engineer has determined native soils are not <br /> suitable for backfill, and other Work as required, from a Contractor-supplied source in <br /> accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> The "significant change" provisions of Section 1-04.6 do not apply. Actual quantities will be <br /> determined in the field as work progresses. I <br /> Bid Item 27 • Crushed Surfacing Base Course <br /> Measurement and Payment: Unit Price per Ton I <br /> Measurement for crushed surfacing base course shall be by the ton as recorded on <br /> certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> Surfacing Base Course material placed exceeding "neatline" quantities without advance <br /> authorization by the Inspector will not be paid for. <br /> Crushed surfacing base course used in pipe zone bedding is not included and is paid for in <br /> other bid items. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br /> 111 <br /> and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br /> crushed surfacing base course for the Work as required, from a Contractor supplied source <br /> in accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing base course also includes all costs for controlling <br /> moisture content. <br /> I <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-12 <br />