Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS I <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as I <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. I 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5-and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> I <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09 WATER MAINS <br /> I <br /> 7-09.1 Description <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> I <br /> This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. I 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> I <br /> Pipe zone backfill includes material placed a minimum of 6-inches below the <br /> bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br /> I <br /> on COE Standard Drawing No. 614, 615, and 620. <br /> 7-09.2 Materials <br /> Substitute the following for the corresponding material in the material list in 7-09.2: I Ductile Iron Pipe for main line 9-30.1(1) Special Provisions <br /> Restrained Joints 9-30.2(6) Special Provisions <br /> Bolted, Sleeve—Type Couplings 9-30.2(7) Special Provisions I for Plain End Pipe <br /> Restrained Flexible Couplings 9-30.2(8) Special Provisions <br /> Aggregates: <br /> I <br /> Foundation Material 9-03.17 Standard Specifications <br /> Crushed Surfacing Base 9-03.9(3) Standard Specifications <br /> Course for Pipe Zone Bedding I Pipe Zone Backfill 9-03.12(3) Standard Specifications <br /> Trench Backfill 9-03.14(1) Standard Specifications & <br /> 9-03.15 Standard Specifications <br /> Sand Backfill for Pipe Zone 9-03.22 Standard Specifications <br /> Controlled Density Fill 2.09.3(1)E Special Provisions <br /> 7-09.3 Construction Requirements 1117-09.3(5) Grade and Alignment <br /> Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br /> Provide minimum cover from the final surface grade to the top of the pipe of 36- <br /> I <br /> inches for water mains less than 12-inches in diameter and 48-inches for water <br /> mains 12-inches or greater in diameter. Provide 60-inches as the maximum depth <br /> from the final surface grade to the top of all water main pipes. Adhere to both <br /> I <br /> minimum and maximum depths from finish grades unless Plans indicate <br /> otherwise. <br /> I <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> I <br /> WO No.—UP3633 SP-162 <br />