My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> I7-09.3(7) Trench Excavation <br /> Revise the second paragraph in 7-09.3(7) to read as follows: <br /> I Excavate bell holes to the extent necessary to permit accurate Work in making <br /> and inspecting the joints. Keep the banks of the trenches as nearly vertical as soil <br /> conditions will permit, and where required to control trench width or to protect <br /> I adjacent Structures, sheet and brace the trench. Provide trench widths to 1 foot <br /> above the top of the pipe in accordance with COE Standard Drawing No. 610. <br /> Standard excavating equipment shall be adjusted so as to excavate the narrowest <br /> I trench possible. <br /> 7-09.3(7)A Dewatering of Trench <br /> Supplement 7-09.3(7)A by adding the following: <br /> I Furnish, install, and operate necessary machinery, appliances, and <br /> equipment to keep excavations free from water during construction. <br /> 7-09.3(8) Removal and Replacement of Unsuitable Materials <br /> IDelete all three paragraphs of 7-09.3(8) and substitute the following: <br /> Remove Engineer classified unsuitable material at the trench bottom and replace <br /> I <br /> with "Foundation Material Class A or B", or other Engineer approved imported or <br /> native material. <br /> Replace, at Contractor's expense, unauthorized over-excavation with Gravel <br /> Borrow. Compact Gravel Borrow to minimum 90-percent maximum density. <br /> 1 7-09.3(9) Bedding the Pipe <br /> Revise the first paragraph in 7-09.3(9)to read as follows: <br /> I Place sand backfill for pipe zone bedding to the depths shown in COE Standard <br /> Drawing No. 615. Compact sand backfill for pipe zone bedding around the pipe to <br /> 90-percent of maximum density by approved hand-held tools, so as to provide firm <br /> I and uniform support for the full length of the pipe, valves, and fittings. Determine <br /> maximum in place density using nuclear method (ASTM 2922-17). Determine <br /> laboratory maximum dry density and optimum moisture content using the Modified <br /> I Proctor Method in accordance with ASTM D-1557. Take care to prevent damage <br /> to the pipe and its protective coating. <br /> 7-09.3(10) Backfilling Trenches <br /> I Revise the last paragraph in 7-09.3(10) to read as follows: <br /> Place a minimum 12-inch sand cushion between the water main and existing <br /> pipelines or other conduits when encountered during construction. <br /> ISupplement 7-09.3(10) by adding the following: <br /> Backfill trenches in accordance with COE Standard Drawings No. 615 and 620. <br /> I <br /> Unless Engineer directs otherwise, provide Controlled Density Fill for fill above the <br /> pipe zone for water main construction that is perpendicular to the travel lane in <br /> paved street sections. <br /> The Engineer may authorize the use of Gravel Borrow or suitable native material <br /> I <br /> in non-paved areas. <br /> 7-09.3(13) Handling of Pipe <br /> I Supplement 7-09.3(13) by adding the following: <br /> Supply water main pipe having ends plugged by manufacturer immediately after <br /> manufacturing to eliminate debris entrance into the pipe during shipping and <br /> I storage. Leave plugs in place until installing pipe in trench. Failure to supply the <br /> debris plugs or to maintain the debris plugs until pipe installation may be cause for <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> I R39 Modifications <br /> WO No.—UP3633 SP-163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.