My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 10. A counterbalance mechanism may be necessary to effectively work against <br /> the gravitational forces acting on the hatches, as some hatches may be <br /> located on sloping grades. Refer to plans for hatch locations and orientation <br /> to grades. <br /> Access Hatch Schedule: <br /> xxM>=,r == ;; <br /> . . =Access Hatch <br /> Structure. = Hatch°>T e <br /> rating <br /> �,. ..G <br /> R39 Manhole Single Leaf, Traffic Duty HS-30 Not Applicable <br /> 7-10.3 Construction Requirements I <br /> 7-10.3(1) Preparation <br /> Coordinate hatch with concrete placement and slide gate placement. <br /> If appropriate, hatch design and construction requirements shall be coordinated with <br /> precast structure suppliers. The Contractor's attention is directed to the requirements <br /> in Section 7-05. If access ladders are to be provided, hatches shall be coordinated <br /> with ladder location and requirements for entry. <br /> 7-10.3(2) Installation <br /> Install in accordance with manufacturer's instructions and recommendations and as ' <br /> shown on the drawings. <br /> In paved areas, unless otherwise shown on the drawings or directed by the Engineer, <br /> hatches shall be flush with finish grade. <br /> 7-10.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-10.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-11 Fiber Reinforced Plastic (FRP) Grating and Structural Shapes , <br /> 7-11.1 Description <br /> This section specifies requirements for vault and manhole landings. I <br /> Design, furnish, fabricate, and install all fiberglass reinforced plastic (FRP) grating and <br /> structural shapes being used at vault and manhole landings, including connection <br /> clips, hardware, and incidentals necessary to produce a complete installation as shown I <br /> on the Contract Drawings and as specified herein, and in accordance with the <br /> requirements of the Contract Documents. <br /> 7-11.1(1) Quality Assurance I <br /> Single source responsibility: Contractor shall obtain grating, structural shapes, and <br /> accessories from one manufacturer. <br /> Manufacturer shall offer a 3 year limited warranty on all FRP products against defects I <br /> in materials and workmanship. <br /> Manufacturer shall be certified to the ISO 9001-2000 standard. <br /> Manufacturer shall provide proof, via independent testing less than six months old, that <br /> materials proposed as a solution do not contain heavy metals in amounts greater than <br /> that allowed by current EPA requirements. <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> WO No.—UP3633 SP-170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.