My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 Where shown on the Plans, provide valve marker post with the exposed portion having <br /> the letter "V" and the distance in feet to the valve stenciled in black paint on the post. <br /> Provide a two inch high stencil to produce the letters and numerals. <br /> 7-12.4 Measurement <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14 HYDRANTS <br /> 7-14.2 Materials <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: <br /> Hydrants 9-30.5 Special Provisions <br /> 7-14.3 Construction Requirements <br /> 7-14.3(1) Setting Hydrants <br /> Delete the first, second, fourth and fifth paragraphs in 7-14.3(1) and substitute the <br /> following: <br /> Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507 and 508. <br /> iIdentify hydrants not in service by covering with a properly secured burlap or <br /> plastic bag. Consider a hydrant in service when it is installed in working order in <br /> accordance with the Plans and Specifications. <br /> ' 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve <br /> at the main to the hydrant in accordance with COE Standard Drawing 507. <br /> Provide mechanical joint restraining glands conforming to 9-30.2(6) of these <br /> Special Provisions. <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> Restrain thrust created in short hydrant laterals of one pipe length or less <br /> using mechanical retainer glands at the auxiliary valve and hydrant fittings as <br /> shown in the COE Standard Drawing No. 507. For longer hydrant leads <br /> requiring two or more pipe lengths, Contractor may use field lock gaskets in <br /> lieu of mechanical joint restraint system to restrain the number of pipe joints <br /> between the auxiliary valve and the hydrant. <br /> 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes <br /> Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7- <br /> 1 12 and COE Standard Drawing No. 507. <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> WO No.—UP3633 SP-175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.