Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-14A Measurement <br /> Delete all paragraphs of 7-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14.5 Payment I <br /> Delete all paragraphs of 7-14.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15 SERVICE CONNECTIONS <br /> 7-15.1 General Description <br /> Delete the first paragraph of 7-15.1 and substitute the following: <br /> This Work consists of installing residential and commercial service connections from <br /> the main to the private line for the premises served. Include the meter box and meter <br /> setter for existing non-metered services. Include replacing existing meter boxes and <br /> meter setters as noted on the Plans and as directed by the Engineer. <br /> Work also includes abandoning existing service connection and service connection <br /> pipe in-place. <br /> 7-15.2 Materials <br /> Delete first paragraph and material list of 7-15.2 and substitute the following: <br /> Provide materials meeting the requirements of the following sections: 1 <br /> Saddles 9-30.6(1) Special Provisions <br /> Corporation Stops 9-30.6(2) Special Provisions <br /> Service Pipe 9-30.6(3) Special Provisions <br /> Service Fittings 9-30.6(4) Special Provisions <br /> Meter Setters 9-30.6(5) Special Provisions <br /> Meter Boxes 9-30.6(7) Special Provisions <br /> Brass Nipples and 9-30.6(8) Special Provisions <br /> Fittings <br /> 7-15.3 Construction Requirements <br /> Revise the first paragraph in 7-15.3 to read as follows: <br /> Provide new service connections to new water mains using specified saddles of the <br /> size and type suitable for use with the service pipe being installed. Install new service <br /> connection piping from the main to the meter box as shown on the Plans and directed <br /> by the City Inspector. Install service connection piping perpendicular to the main, <br /> unless shown otherwise on the Plans or directed by the City Inspector. I <br /> Revise the first sentence of the second paragraph in 7-15.3 to read as follows: <br /> Provide trench depth adequate to maintain a minimum of 30-inches of cover over the <br /> top of the connecting service pipe. <br /> Delete the fourth paragraph in 7-15.3. <br /> Supplement 7-15.3 by adding the following: <br /> Provide service connections to water mains in accordance with COE Standard <br /> Drawings No. 501 and 502 as applicable. <br /> Field verify actual service connection location, size and material as existing service <br /> information and locations shown on the Plans may not be accurate since this <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> WO No.—UP3633 SP-176 <br />