Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> 1 information is taken from existing records. Match the service size of the existing <br /> service connection with the minimum service size being 3/4-inch. Should the planned <br /> I location require moving after verifying actual service connection in field, City Inspector <br /> and the City Utility Department personnel will make final decision as to its relocation. <br /> Replace existing services from the main to the property line, including the meter box <br /> land meter setting if noted on the Plans. <br /> Bore service connection lines, regardless of size, under pavement section, curbs and <br /> sidewalks where soil conditions and other existing buried utilities allow. The City <br /> I Inspector will allow open-cut trench installation across pavement section, curbs and <br /> sidewalks only where soil conditions prohibit boring. Open—cut lawn areas and other <br /> non-pavement areas for service installation unless City Inspector directs otherwise. <br /> The City Inspector may, at the Contractor's request, allow tunneling under curb and <br /> I sidewalk as long as it appears no structural damage will be done to curb or sidewalk <br /> as a result of the tunneling operations. Regardless of the method used, the Contractor <br /> shall maintain a minimum of 30-inch cover over the service connection line. Where <br /> I . open cut trench installation is allowed, keep the trench width to 24-inches or less. <br /> Provide Controlled Density Fill for the full depth of backfill when open cutting streets. <br /> At existing metered services noted for removal or replacement on the Plans, salvage <br /> I existing meter and stockpile on-site at location approved by City Inspector. Notify City <br /> Inspector 24-hours prior to removal to allow City Inspector to document the meter <br /> number and address of meter being removed. Remove and dispose of existing meter <br /> I box, meter setter, fittings and service piping. Where existing metered services are not <br /> being replaced, backfill with native soil, compact and restore the surface to match <br /> existing condition. <br /> I Abandon in-place existing service connections noted on the Plans by exposing and <br /> closing the corporation stop at the main and plugging the service line near the public <br /> right of way or easement. <br /> I 7-15.3(1) Relocate Water Meter and Box <br /> (******) <br /> Where shown on the Plans, or as directed by the City Inspector, salvage the existing <br /> I water meter, meter box and the meter setter being relocated. Reinstall salvaged water <br /> meter, meter box and setter and provide new service connection pipe in accordance <br /> with City of Everett Standard Drawing Nos. 501 and 502 and adjust box to finish grade. <br /> I Abandon in-place existing service pipe connection by exposing and closing the <br /> corporation stop at the main and plugging the service line at the old meter box location. <br /> 7-15.4 Measurement <br /> IDelete first paragraph of 7-15.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> I described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15.5 Payment <br /> I Delete all paragraphs of 7-15.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> ISection 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-17 SANITARY SEWERS <br /> I 7-17.1 Description <br /> Revise the first paragraph in 7-17.1 to read as follows: <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> I R39 Modifications <br /> WO No.—UP3633 SP- 177 <br />