My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> I <br /> WATER MAINS, AND CONDUITS 153 <br /> 7-04 STORM SEWERS 153 <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS 154 <br /> 7-06 SLIDE GATES (******) 156 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 159 <br /> 7-09 WATER MAINS 162 <br /> 7-10 ACCESS HATCHES 168 <br /> 7-11 FIBER REINFORCED PLASTIC (FRP) GRATING AND <br /> STRUCTURAL SHAPES 170 1 <br /> 7-12 VALVES FOR WATER MAINS 174 <br /> 7-14 HYDRANTS 175 <br /> 7-15 SERVICE CONNECTIONS 176 <br /> 7-17 SANITARY SEWERS 177 <br /> 7-21 TEMPORARY BYPASS PUMPING 179 <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION 185 <br /> 8-01 EROSION CONTROL 185 <br /> 8-02 ROADSIDE RESTORATION 186 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS 187 <br /> 8-05 PRIVATE IMPROVEMENTS (******) 188 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 189 <br /> 8-12 CHAIN LINK FENCE AND WIRE FENCE 190 <br /> 8-13 SURVEY MONUMENTS AND CASES (******) 190 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 191 <br /> 8-21 PERMANENT SIGNING 193 <br /> 8-22 PAVEMENT MARKING 194 <br /> DIVISION 9 - MATERIALS 195 <br /> 9-03 AGGREGATES 195 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 195 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 196 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 197 <br /> 9-30 WATER DISTRIBUTION MATERIALS 198 <br /> APPENDIX A- GEOTECHNICAL REPORT A-1 <br /> APPENDIX B - COE STANDARD DRAWINGS B-1 <br /> APPENDIX C - CHANGE ORDER FORMS C-1 <br /> APPENDIX D - PUGET SOUND CLEAN AIR AGENCY- EXCERPTS OF AIR <br /> QUALITY RULES D-1 <br /> APPENDIX E -WSDOT NOISE WALL AS-BUILTS E-1 <br /> APPENDIX F - EXISTING PLANTING PLAN AT R4 SITE F-1 <br /> I <br /> I <br /> 1 <br /> Sewer Regulators R4 and TABLE OF CONTENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.