My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> as accurate or adequate, and does not take responsibility for, or warrant that shop <br /> drawings will meet Contract requirements. <br /> Engineer's review of shop drawings shall not relieve Contractor from responsibility for <br /> variation from the requirements of the Contract Documents unless Contractor has in <br /> writing called the Engineer's attention to each such variation at the time of submission, <br /> and the Engineer has given written approval of each such variation by a specific <br /> written notation thereof incorporated in or accompanying the returned shop drawing; <br /> nor will review by Engineer relieve Contractor from responsibility for errors or <br /> omissions in the shop drawings or from responsibility for having complied with the <br /> provisions of this section. <br /> The Bid prices shall include all costs for furnishing shop drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require shop drawings, catalog cuts or standard drawings that may or may not be <br /> applicable to this specific project. This list is supplied as an aid to the Contractor and <br /> is by no means complete. Submittal requirements may be found in 1-05.3(1) or <br /> elsewhere in these Special Provisions. <br /> DIVISION 2 EARTHWORK <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br /> DIVISION 6 STRUCTURES I <br /> 6-01 General Requirements <br /> 6-01.9 Working Drawings <br /> 6-02 Concrete Structures <br /> 6-02.3(13) Expansion Joints-Shop Drawings <br /> 6-02.3(16) Plans for Falsework and Forms-Shop Drawings I <br /> 6-02.3(26)A Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-04 Storm Sewers <br /> 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-06 Slide Gates <br /> 7-09 Water Mains <br /> 7-09.2 Materials-Catalog Cuts or Standard Plans <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans I <br /> 7-17 Sanitary Sewers <br /> 7-17.2 Materials-Catalog Cuts or Standard Plans <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 111 <br /> R39 Modifications <br /> WO No—UP3633 SP-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.