EN <br /> 2. Evaluate Seismic Design Parameters: Based on the geologic information near the FEN <br /> improvements, HWA will determine the Site Class for seismic design. <br /> 3. Evaluate Liquefaction and Lateral Spreading: HWA will evaluate the susceptibility to <br /> liquefaction at the location of the proposed vault with the soil information obtained from the <br /> proposed additional boring. Once the susceptibility to liquefaction is determined, we will <br /> evaluate the potential for lateral spreading and other potential impacts to the proposed and <br /> existing structures. <br /> 4. Settlement Analysis: The chlorine building will be located on the north side of the dike and <br /> will require fill placement to achieve finish floor elevation. HWA will estimate settlements due <br /> to site grading at the locations of the proposed new chlorine building and the new vault. <br /> Also, HWA will evaluate possible consolidation settlements due to site grading. <br /> 5. Foundation Vertical Capacities: HWA will evaluate vertical foundation pile capacities and <br /> provide recommendations for pile design for the proposed new chlorine building, culvert and <br /> vault structures. <br /> 6. Pile Foundation Lateral Parameters: HWA will perform lateral analyses of pile foundations <br /> using LPILE. Per design team request, HWA will provide lateral soil resistance parameters <br /> in the form of spring constants for the piles at 2-foot intervals over the full depths of the <br /> piles. <br /> 7. Fill/Preload Recommendations on Proposed Chlorine Building: The chlorine building will be <br /> located at the north side of the dike and will require fill placement to achieve finish floor <br /> elevation. HWA will provide fill/preload recommendations at this location, considering <br /> potential for consolidation settlements. <br /> 8. Preload Monitoring: HWA will provide preload monitoring recommendations at the proposed <br /> location of the chlorine building. <br /> 9. Retaining Wall Recommendation: It is our understanding that a retaining wall will be <br /> required at the proposed location of the chlorine building to accommodate increases in <br /> grade. HWA will provide design recommendations for the proposed retaining wall. <br /> 10. Lateral Earth Pressures: HWA will provide lateral earth pressure recommendations for below <br /> grade structures. <br /> 11. Shoring Design: HWA will provide shoring design recommendation for the construction of <br /> the proposed new vault and for the installation of the proposed culvert. <br /> 12. Vibration Monitoring Recommendations for Outfall Pipe near Proposed New Vault: It is <br /> understood that an existing 48-year-old, 48-inch diameter outfall pipe is connected to one of <br /> the manholes that will be replace during the vault construction. HWA will provide temporary <br /> monitoring recommendations for the existing monitoring pipe. <br /> 13. Earthwork and Dewatering Recommendations: HWA will develop recommendations for <br /> earthwork and construction dewatering, as needed. <br /> 14. HWA QA/QC: HWA will have all design calculations and recommendations reviewed by a <br /> senior principal prior to distribution to the design team or the City. <br /> 15. Project Coordination Meetings: HWA will meet with the City and design team to present our <br /> findings and discuss alternatives. (3 meetings) <br /> 16. Draft Geotechnical Engineering Report: HWA's geotechnical engineering report will present <br /> the results of the geotechnical engineering investigation, including a description of <br /> subsurface conditions; a site plan showing exploration locations and other pertinent <br /> City of Everett—WPCF FEN Phase 2 3 Scope of Services <br />