Laserfiche WebLink
features; summary boring logs; and laboratory test results. The report will provide a narrative <br /> and geotechnical recommendations for each of the above described geotechnical aspects of <br /> the project. <br /> 17. Prepare a Final Geotechnical Engineering Report: HWA will finalize our geotechnical report <br /> once we receive review comments from HDR and the City of Everett. <br /> 18. Conduct Plan and Specification Review: HWA will conduct a plan review at the 50, 90 and <br /> 100 percent milestones to verify that the geotechnical aspects of the project have been <br /> properly incorporated into the project plans. <br /> Client Responsibilities <br /> 1. Provide timely review comments on the Draft Geotechnical Engineering Report, reconciled, <br /> and internally consistent set of review comments, free of conflicting direction and input, in <br /> response to draft work products.. <br /> 2. Provide access to the site as needed. <br /> Assumptions <br /> 1. No Geology and Soil Discipline Report will be required. <br /> 2. No Phase 1 Environmental Site Assessment report will be required. <br /> Deliverables <br /> 1. Draft Geotechnical Engineering Report (e-mailed PDF). <br /> 2. Final Geotechnical Engineering Report (e-mailed PDF). <br /> Task 1000 Permit Acquisition and Environmental Support <br /> Objective <br /> As identified in the following subtasks, this task includes permit acquisition and environmental <br /> services activities to support design efforts for the FEN Chlorination Building and the Outfall MH <br /> structure. These activities will be coordinated to be consistent with the overall project schedule. <br /> Subtask 1000.01 Permit Tracking and Schedule Coordination <br /> HDR Services <br /> 1. Identify permits and regulatory requirements for construction of the project. <br /> 2. Prepare/update the Permit List/Matrix that will document the permit triggers, submittal <br /> requirements, processing timelines, and agency contact information for each <br /> permit/approval; the matrix will be used as the road map for permit acquisition efforts. <br /> 3. Provide permitting and environmental input to the overall project schedule. <br /> Client Responsibilities <br /> 1. Review Permit Matrix. <br /> City of Everett—WPCF FEN Phase 2 4 Scope of Services <br />