Laserfiche WebLink
FN <br /> Client Responsibilities <br /> 1. Provide a single consolidated, reconciled, and internally consistent set of review comments, <br /> free of conflicting direction and input, in response to draft work products. <br /> 2. Pay all permit fees and legal notices required for the project. <br /> 3. Procure and install notice boards and signs, as required. <br /> 4. Publish any required notices. <br /> 5. Submit permit packages. <br /> Assumptions <br /> 1. It is assumed that permit submittal packages for the following permits/approvals are to be <br /> prepared and submitted as part of this subtask: <br /> A. U.S. Army Corps of Engineers (Corps) <br /> i. Section 404 Permit <br /> B. U.S. Fish and Wildlife Service/NOAA Fisheries <br /> i. Section 7 Endangered Species Act Compliance (see Subtask 1000.07) <br /> C. WA Department of Fish and Wildlife <br /> i. Hydraulic Project Approval <br /> D. WA Department of Ecology <br /> i. 401 Water Quality Certification <br /> ii. Coastal Zone Consistency Determination <br /> iii. NPDES Construction Stormwater General Permit <br /> E. WA Department of Archaeology and Historic Preservation <br /> i. Section 106 Review (National Historic Preservation Act) <br /> F. City of Everett Public Works <br /> i. Site Development (Grading) Permit (FEN Chlorination Building) <br /> ii. Site Development (Grading) Permit (Outfall MH Structure) <br /> iii. State Environmental Policy Act Compliance (see Subtask 1000.05) <br /> G. City of Everett Permit Services <br /> i. Shoreline Substantial Development Permit (Outfall MH Structure) <br /> ii. Critical Areas Approval <br /> iii. Building Permit <br /> 2. Replacement of the outfall diffuser in the Snohomish River is considered maintenance and <br /> does not trigger any permits. <br /> 3. The Outfall MH Structure will require Shoreline Permit and a separate Site Development <br /> Permit; a Building Permit is not required. <br /> 4. The City has sufficient cultural resource information to support Section 106 review. <br /> City of Everett—WPCF FEN Phase 2 6 Scope of Services <br />